Issue |
E3S Web Conf.
Volume 248, 2021
2021 3rd International Conference on Civil Architecture and Energy Science (CAES 2021)
|
|
---|---|---|
Article Number | 02007 | |
Number of page(s) | 4 | |
Section | Energy Technology Application and Energy Saving and Emission Reduction Research and Development | |
DOI | https://doi.org/10.1051/e3sconf/202124802007 | |
Published online | 12 April 2021 |
Research on Priority Evaluation Model of Project Associated Clusters
1 China Electric Power Research Institute, Beijing, 100192, China
2 State Grid Zhejiang Electric Power Company Limited Economic & Technical Research Institute, Hangzhou, 310001, China
3 North China Electric Power University, Beijing, 102206, China
* Corresponding author: 18811612979@163.com
At present, there are still some urgent problems to be solved, such as repeated reserve projects, unreasonable timing arrangement of investment in project execution, poor effect of capital use and poor process connection. In this paper, through the related cluster demonstration of the comprehensive plan projects, we strengthen the pre-management and control of the reserve projects from the source, and improve the quality and efficiency of the comprehensive plan management. Firstly, this paper classifies the projects based on the perspective of business association, establishes the association cluster, and then constructs the priority evaluation model of the project association cluster with the help of the portfolio management theory, so as to maximize the project benefit.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.