Issue |
E3S Web Conf.
Volume 252, 2021
2021 International Conference on Power Grid System and Green Energy (PGSGE 2021)
|
|
---|---|---|
Article Number | 01058 | |
Number of page(s) | 4 | |
Section | Power Control Technology and Smart Grid Application | |
DOI | https://doi.org/10.1051/e3sconf/202125201058 | |
Published online | 23 April 2021 |
Research on Evaluation and Optimization Methods of Power Grid Investment Projects Based on Effectiveness Contribution
1 Power Grid Planning & Research Center, Guangdong Power Grid Co., Ltd., Guangzhou City, Guangdong, 510000, China
2 School of Economics and Management, North China Electric Power University, Beijing 102206, China
* Corresponding author’s e-mail: 1182306191@ncepu.edu.cn
Facing the current complex operation and management situation, power grid companies must improve the level of precision investment and improve the efficiency of project input and output. Based on the different goals of project investment, this paper uses comprehensive benefit evaluation methods to carry out micro-investment demand analysis from the project dimension, builds a quantitative evaluation index system for comprehensive benefits of power grid projects based on effectiveness contribution evaluation, and combines the analytic hierarchy process and entropy weight method to determine the index weights. Analyze the contribution degree of each project to the power grid after it is put into production through indicators, and realize the priority ranking of power grid investment projects according to the comprehensive benefit evaluation score of the project. The research results can provide reference and reference for improving the output efficiency of power grid investment projects.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.