2021 3rd International Conference on Civil Architecture and Energy Science (CAES 2021)
|
|
---|---|---|
Article Number | 03004 | |
Number of page(s) | 7 | |
Section | Research on Civil Water Conservancy Engineering and Urban Architecture | |
DOI | https://doi.org/10.1051/e3sconf/202124803004 | |
Published online | 12 April 2021 |
Optimization and Application of Support Scheme for Tunnel with High In-situ Stress in Ningchan
Qinghai Communications Construction Management Co, Ltd., Xining, Qinghai, 810003, China
* Corresponding author: 413436993@qq.com
Based on the national highway 569 Mandala Datong highway Ningchan tunnel, the study on the optimization design of high ground stress tunnel support parameters is carried out. The results show that the single-layer primary support with I20b as the main support framework cannot control the large deformation of high ground stress tunnel, mainly manifested as arch frame failure and concrete spalling; adopting “double-layer initial support” can control large deformation to a certain extent; increasing the stiffness of inner layer support can reduce the “double-layer” to a certain extent The results show that the cumulative deformation of “support”, but cannot significantly shorten the deformation stability period; appropriately increasing the reserved deformation between the inner and outer layers of the initial support has the best supporting effect, the cumulative deformation is small, and the deformation stability period is shortened. The research results provide a basis for similar high stress tunnel support measures.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.