Issue |
E3S Web Conf.
Volume 253, 2021
2021 International Conference on Environmental and Engineering Management (EEM 2021)
|
|
---|---|---|
Article Number | 02044 | |
Number of page(s) | 5 | |
Section | Big Data Environment Management Application and Industry Research | |
DOI | https://doi.org/10.1051/e3sconf/202125302044 | |
Published online | 06 May 2021 |
Critical success factors associated with time performance in prefabricated construction
Sayre School Lexington United States
Corresponding author: Zhaomingyue6228@163.com
Prefabricated construction becomes an increasingly important construction mode especially for buildings that require a short construction time. The construction of Huoshenshan Hospital shows how efficient prefabricated construction could be. In order to provide a clearer blueprint for how to improve time performance in prefabricated construction, this paper identifies 13 important critical success factors associated with time performance and groups them into five categories—project planning and design, supply chain, techniques, teamwork, and external influences. The findings of this paper provide a better understanding of time management in prefabricated construction, which can help to develop appropriate strategies to improve productivity.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.