Open Access
Issue
E3S Web Conf.
Volume 253, 2021
2021 International Conference on Environmental and Engineering Management (EEM 2021)
Article Number 02044
Number of page(s) 5
Section Big Data Environment Management Application and Industry Research
DOI https://doi.org/10.1051/e3sconf/202125302044
Published online 06 May 2021
  1. Jiang, Lei, Zhongfu Li, Long Li, and Yunli Gao. “Constraints on the promotion of prefabricated construction in China.” Sustainability 10, no. 7 (2018): 2516. [Google Scholar]
  2. Shen, Liyin, Xiangnan Song, Ya Wu, Shiju Liao, and Xiaoling Zhang. “Interpretive Structural Modeling based factor analysis on the implementation of Emission Trading System in the Chinese building sector.” Journal of Cleaner Production 127 (2016): 214–227. [Google Scholar]
  3. Li, Zhengdao, Geoffrey Qiping Shen, and Xiaolong Xue. “Critical review of the research on the management of prefabricated construction.” Habitat international 43 (2014): 240–249. [Google Scholar]
  4. Wang, Jiayuan, Hongping Yuan, Xiangping Kang, and Weisheng Lu. “Critical success factors for on-site sorting of construction waste: a China study.” Resources, conservation and recycling 54, no. 11 (2010): 931–936. [Google Scholar]
  5. Mao, Chao, Qiping Shen, Liyin Shen, and Liyaning Tang. “Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: Two case studies of residential projects.” Energy and Buildings 66 (2013): 165–176. [Google Scholar]
  6. Jaillon, L., Chi-Sun Poon, and Y.H. Chiang. “Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong.” Waste management 29, no. 1 (2009): 309–320. [Google Scholar]
  7. Wang, Zhaojing, Hao Hu, and Jie Gong. “Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components.” Automation in Construction 86 (2018): 69–80. [Google Scholar]
  8. Miller, Roger, Mike Hobday, Thierry Leroux-Demers, and Xavier Olleros. “Innovation in complex systems industries: the case of flight simulation.” Industrial and corporate change 4, no. 2 (1995): 363–400. [Google Scholar]
  9. Rockart, John Fralick. “The changing role of the information systems executive: a critical success factors perspective.” (1980). [Google Scholar]
  10. Wuni, Ibrahim Yahaya, and Geoffrey Qiping Shen. “Critical success factors for modular integrated construction projects: a review.” Building Research & Information (2019): 1–22. [Google Scholar]
  11. Wuni, Ibrahim Yahaya, Geoffrey Qiping Shen, and Bon-Gang Hwang. “Risks of modular integrated construction: A review and future research directions.” Frontiers of Engineering Management (2020): 1–18. [Google Scholar]
  12. Gan, Xiaolong, Ruidong Chang, Jian Zuo, Tao Wen, and George Zillante. “Barriers to the transition towards off-site construction in China: An Interpretive structural modeling approach.” Journal of cleaner production 197 (2018): 8–18. [Google Scholar]
  13. Gibb, Alistair GF. “Standardization and preassembly-distinguishing myth from reality using case study research.” Construction Management & Economics 19, no. 3 (2001): 307–315. [Google Scholar]
  14. Mao, Chao, Qiping Shen, Wei Pan, and Kunhui Ye. “Major barriers to off-site construction: the developer’s perspective in China.” Journal of Management in Engineering 31, no. 3 (2015): 04014043 [Google Scholar]
  15. Hasan, Abid, Bassam Baroudi, Abbas Elmualim, and Raufdeen Rameezdeen. “Factors affecting construction productivity: a 30 year systematic review.” Engineering, Construction and Architectural Management (2018). [Google Scholar]
  16. Walker, Derek HT. “An investigation into construction time performance.” Construction Management and Economics 13, no. 3 (1995): 263–274. [Google Scholar]
  17. Kamar, K. A. M., M. Alshawi, and Z. Hamid. “Barriers to industrialized building system (IBS): The case of Malaysia.” In In BuHu 9th International Postgraduate Research Conference (IPGRC), Salford, United Kingdom. 2009. [Google Scholar]
  18. Kamar, Kamarul Anuar Mohamad, and Zuhairi Abd Hamid. “Supply chain strategy for contractor in adopting industrialized building system (IBS).” Australian Journal of Basic and Applied Sciences 5, no. 12 (2011): 2552–2557. [Google Scholar]
  19. Azhar, Salman, Maulik Y. Lukkad, and Irtishad Ahmad. “An investigation of critical factors and constraints for selecting modular construction over conventional stick-built technique.” International Journal of Construction Education and Research 9, no. 3 (2013): 203–225. [Google Scholar]
  20. Wuni, Ibrahim Y., Geoffrey QP Shen, and Abba Tahir Mahmud. “Critical risk factors in the application of modular integrated construction: a systematic review.” International Journal of Construction Management (2019): 1–15. [Google Scholar]
  21. O’Connor, James T., William J. O’Brien, and Jin Ouk Choi. “Critical success factors and enablers for optimum and maximum industrial modularization.” Journal of Construction Engineering and Management 140, no. 6 (2014): 04014012. [Google Scholar]
  22. “National Council of Architectural Registration Boards.” NCARB. Accessed August 26, 2020. https://www.ncarb.org/. [Google Scholar]
  23. Nasirian, Araz, Mehrdad Arashpour, Babak Abbasi, and Ali Akbarnezhad. “Optimal work assignment to multiskilled resources in prefabricated construction.” Journal of Construction Engineering and Management 145, no. 4 (2019): 04019011. [Google Scholar]
  24. Goodier, Chris I., and Alistair GF Gibb. “Barriers and opportunities for offsite in the UK.” In Systematic Innovation in the Management of Projects and Processes. Abdul Samad Kazi (ed), Cib Helsinki international joint symposium, pp. 148–158. 2005. [Google Scholar]
  25. The Oxford Dictionary. Oxford: Oxford University Press, 1992. [Google Scholar]
  26. Arashpour, Mehrdad, Yu Bai, Guillermo Aranda-mena, Alireza Bab-Hadiashar, Reza Hosseini, and Pushpitha Kalutara. “Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction.” Automation in Construction 84 (2017): 146–153. [Google Scholar]
  27. Hong, Jingke, Geoffrey Qiping Shen, Zhengdao Li, Boyu Zhang, and Wanqiu Zhang. “Barriers to promoting prefabricated construction in China: A cost-benefit analysis.” Journal of cleaner production 172 (2018): 649–660. [Google Scholar]
  28. “Youku - Apps on Google Play.” Google. Google. Accessed August 26, 2020. https://play.google.com/store/apps/details?id=com.youku.phone. [Google Scholar]
  29. Polat, Gul. “Factors affecting the use of precast concrete systems in the United States.” Journal of Construction Engineering and Management 134, no. 3 (2008): 169–178. [Google Scholar]
  30. “Home.” CGTN. Accessed August 26, 2020. https://www.cgtn.com/. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.