Issue |
E3S Web Conf.
Volume 257, 2021
5th International Workshop on Advances in Energy Science and Environment Engineering (AESEE 2021)
|
|
---|---|---|
Article Number | 02083 | |
Number of page(s) | 7 | |
Section | Research on Energy Consumption and Energy Industry Benefit | |
DOI | https://doi.org/10.1051/e3sconf/202125702083 | |
Published online | 12 May 2021 |
Research on Construction Risk Management of Underground Engineering Based on AHP-Fuzzy Comprehensive Evaluation Method
1
Space Support Department, Space Engineering University, Beijing China
2
Space Support Department, Space Engineering University, Beijing China
3
Space Support Department, Space Engineering University, Beijing China
* E-mail: 2925941493@qq.com
In order to strengthen the construction risk management of underground engineering projects, reduce the probability of accidents, and ensure that the underground engineering completes the construction tasks on schedule, the article relies on a certain subway engineering project to carry out research from the aspects of risk identification, risk factor analysis, and risk factor evaluation. The article adopts analytic hierarchy process and fuzzy comprehensive evaluation method to carry out risk factor evaluation weight analysis and risk system evaluation in the construction process, and then realize reasonable prediction and evaluation of construction risk factors. Finally, this essay sorts out the prevention and control measures of underground engineering construction risk management from five aspects of personnel, machinery, management, environment and technology, and then provides auxiliary decision-making for underground engineering construction risk management.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.