Issue |
E3S Web Conf.
Volume 258, 2021
Ural Environmental Science Forum “Sustainable Development of Industrial Region” (UESF-2021)
|
|
---|---|---|
Article Number | 09053 | |
Number of page(s) | 8 | |
Section | Energy Efficiency in Construction | |
DOI | https://doi.org/10.1051/e3sconf/202125809053 | |
Published online | 20 May 2021 |
System of indicators for planning and evaluating production capacity of a construction and installation organization
Moscow State University of Civil Engineering, 129377, Moscow, Russia
* Corresponding author: ivan2193@yandex.ru
To assess the production capacity of a construction and installation organization, the actual volume of work performed for a certain period and planned indicators for the use of certain resources are used. Since the state of production facilities depends not only on the production program, but also on the current state of labor resources, the actual task is to choose the most effective criteria for planning and evaluating the production capacity of a construction and installation organization. In formulating the criteria, the author was guided by the theory, allowing to establish the relationship between the production capacity of building-assembling organizations and production program and capabilities assessment and planning of production capacity for the coefficients of their extensive and intensive use. The study made it possible to form a system of indicators for planning and evaluating the production capacity of a construction and installation organization. The purpose of forming a system of indicators for planning and evaluating production capacities is to take into account in the calculations not only the actual and planned volumes of construction and installation works, but also indicators that reflect the current state of labor resources. The study revealed that through the formation of a system of evaluation indicators, taking into account the impact on production capacity of quantitative and qualitative factors expressed in the structure of labor resources, their qualifications on the one hand, as well as the rhythm and load of the construction and installation organization on the other hand.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.