Issue |
E3S Web Conf.
Volume 263, 2021
XXIV International Scientific Conference “Construction the Formation of Living Environment” (FORM-2021)
|
|
---|---|---|
Article Number | 02034 | |
Number of page(s) | 6 | |
Section | Reliability of Buildings and Constructions and Safety in Construction | |
DOI | https://doi.org/10.1051/e3sconf/202126302034 | |
Published online | 28 May 2021 |
Analysis of the application efficiency of the slab-pile foundation using the example of a two-layer base
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
Corresponding author: chunyuk@mail.ru
The purpose of this work was to determine the increase of the limit load when resting the foundation slab on the ground at a different pitch of piles and their different length. The main task is to calculate the combined pile-slab foundation. The hypothesis was that when the foundation slab in the work, the bearing capacity of the entire structure increases. This foundation was calculated using the Plaxis 3D design software complex. In this article, we have determined the value by which the ultimate load on the combined pile-slab foundation increases when the slab rests on soil.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.