Development of a cost controlling system for an investment and construction project
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
* Corresponding author: BovsunovskayaMP@mgsu.ru
The study is devoted to substantiating the need to develop a cost controlling system in order to improve the efficiency of investors, developers, customers, general contractors, as well as representatives of the banking system who are directly involved in the implementation of investment and construction projects. The paper summarizes the innovations of the Ministry of Construction, Housing and Utilities of the Russian Federation in the field of determining the cost of construction at the stages of the life cycle of an investment and construction project, and suggests their adaptation to the activities of commercial customers. The factors of the rise in the cost of construction in the modern conditions of the investment and construction sphere are systematized, including topical issues of the rise in cost due to the increase in prices of building materials. The main risks arising from the implementation of the project associated with an increase in cost are highlighted. As the results of the study, stages of construction cost control with a description of their content and a system of cost controlling of an investment and construction project are proposed.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.