Issue |
E3S Web Conf.
Volume 263, 2021
XXIV International Scientific Conference “Construction the Formation of Living Environment” (FORM-2021)
|
|
---|---|---|
Article Number | 05026 | |
Number of page(s) | 10 | |
Section | Global Environmental Challenges | |
DOI | https://doi.org/10.1051/e3sconf/202126305026 | |
Published online | 28 May 2021 |
Conceptual model assessing complex the public-private partnership projects effectiveness
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
* Corresponding author: PanteleevaMS@mgsu.ru
The article presents the author’s model assessing complex the public-private partnership (hereinafter PPP) projects effectiveness based on the multifaceted development of this tool for the development of regional economic systems. The relevance of the research topic is since accelerating the pace of fundraising, expanding the range of possible options for public-private partnership agreements, increasing the number of innovative projects increase the problem of developing comprehensive criteria for the PPP effectiveness assessing. Most modern studies are rather narrow in nature and consider only one of the aspects of the development of a PPP instrument: the mutually beneficial union of public and private capital. In this regard, the presented study purpose is to develop a conceptual model for the PPP projects effectiveness comprehensive assessment. The sources of this work are the regulatory legal Russian Federation acts in the field of public-private partnerships, the works of domestic and foreign authors in this area, as well as official information pages from the Internet. The developed model includes three stages of efficiency assessment. At the first stage, a qualitative PPP project assessment is carried out. The principles of integrated PPP projects assessment future model are being formed. The risks are to identify in a PPP project for each stakeholder. The second stage analyzes the value of partnerships. This analysis is based on an assessment of various comparative project performance kinds. At the third stage, a three-aspect assessment of the project’s effectiveness is carried out, considering the potential social result from the project and the benefits of the state and private partners. Based on this, the practical significance of the proposed integrated assessment model is determined, both in the regulations development to justify and the individual PPP projects effectiveness.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.