Risks and reliability assessment of construction processes
Peter the Great St. Petersburg Polytechnic University (SPbРU) ; 29 Politechnicheskaya st., St. Petersburg, 195251, Russian Federation
* Corresponding author: gorodish_ayu@spbstu.ru
Improving the reliability of the implementation of construction schedules for a complex of structures (where the level of quality, timing, and costs is taken into account) can be achieved by creating reserves: time and resources. The reserve of time, the main types of technical, labor, and material resources due to the creation of special structures is in most cases ineffective due to increased costs. Finding the most effective options for creating the corresponding structures from the standpoint of reliability and efficiency is a rather difficult task. An example is given when planning the construction of buildings of a multifunctional complex, a computational matrix is obtained for the flow organization of works. The assessment of the reliability of compliance with the directive deadline for the erection of the mainframe structures are: the critical chain method, the continuous use of resources method, the method of continuous work of front development.
Key words: construction reliability / construction process / construction / high-rise building / construction planning / construction schedule
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.