Open Access
Issue
E3S Web Conf.
Volume 274, 2021
2nd International Scientific Conference on Socio-Technical Construction and Civil Engineering (STCCE – 2021)
Article Number 06008
Number of page(s) 8
Section Construction Technology and Organization
DOI https://doi.org/10.1051/e3sconf/202127406008
Published online 18 June 2021
  1. A.A. Lapidus, Efficiency Potential of Management and Technical Solutions for a Construction Object in Proceedings of the Moscow State University of Civil Engineering, No. 1, pp. 175–180 (2014) DOI: 10.22227/1997-0935.2014.1.175-180 [Google Scholar]
  2. A.V. Ginzburg, Organizational and Technological Reliability of Construction. System Engineering, ed. A.A. Gusakov, Moscow: New Millennium Foundation, 768 p. (2002) [Google Scholar]
  3. A.A. Gusakov, A.V. Ginzburg, S.A. Veremeenko et al. Organizational and Technological Reliability of Construction Systems, Moscow, SvR-Argus Publ., 472 p. (1994) [Google Scholar]
  4. B. Fleischmann, H. Meyr and M. Wagner, "Advanced Planning", In Stadtler, H. & Kilger, C. (Eds.), Supply Chain Management and Advanced Planning, Concepts, Models, Software, and Case Studies, 4th ed, Springer, Berlin. (2008) [Google Scholar]
  5. Yichuan Deng, Jack C.P., Cheng Construction Supply Chain Coordination Leveraging 4D BIM and GIS Integration, 20th World Building Congress, 12 p. (2016) [Google Scholar]
  6. A. E. Agwua, A. Labiba, Sara Hadleigh-Dunnb, Disaster prevention through a harmonized framework for high reliability organisations in Safety Science 111, pp. 298–312 (2019) https://doi.org/10.1016Zj.ssci.2018.09.005 [Google Scholar]
  7. O.I. Nedavny, S.V. Bazilevich, S.M. Kuznetsov, Assessment of organizational and technological reliability of project Construction in Systems. Methods. Technologies. No. 2(18), pp. 137–141 (2013) [Google Scholar]
  8. P.B. Zhavnerov, A.V. Ginzburg, Using Structural Actions to Improve Organizational and Technological Reliability of Construction Activities in Proceedings of Moscow State University of Civil Engineering. No. 3, pp. 196—200 (2013) [Google Scholar]
  9. E.A. Kotova, Yu.P. Ermakova, Methods for increasing the organizational and technological reliability of the construction process in Materials of the International Scientific and Practical Conference of Young Researchers. DI. Mendeleev, dedicated to the 10th anniversary of the Institute of Industrial Technologies and Engineering. Publisher: Federal State Budget Educational Institution of Higher Education «Industrial University of Tyumen», pp. 231–234 (2019) [Google Scholar]
  10. A.S. Bolotova, A.V. Ginzburg, Analysis of Organizational and Technological Reliability of Monolithic Construction in Journal of Economy and Entrepreneurship, No. 10-1 (75-1), pp. 647–651 (2016) [Google Scholar]
  11. E.V. Zanina, V.V. Sokolnikov, Methods of increasing the organizational and technological reliability of construction in Technology and organization of construction. Materials of the I All-Russian interuniversity scientific-practical conference of young scientists, dedicated to the 80th anniversary of the founding of the department "Construction production", pp. 168–171 (2020) [Google Scholar]
  12. G.I. Abdullayev, V.Z. Velichkin, T.N. Soldatenko, The organizational and technological reliability improvement in construction by using failure prediction method in Magazine of Civil Engineering, No. 3 (38), pp. 43–50 (2013) [CrossRef] [Google Scholar]
  13. I.I. Vladimirov, Application of a matrix algorithm for calculating the duration of construction of monolithic buildings using the flow organization of construction production in Science and business: ways of development, No. 4 (82), pp. 89–96 (2018) [Google Scholar]
  14. S.V. Bovteev, Calculation of the parameters of the streamline work organization by the critical path method in Bulletin of Civil Engineers, No. 15 (3), pp. 90–97 (2018) DOI: 10.23968/1999-5571-2018-15-3-90-97. [Google Scholar]
  15. A. Mailyan, G. Afanasiev, D. Antoniadi, R. Petrosyan, Formation of optimal performance of works during establishment of the complex of objects optimal sequence of establishing objects complex building in IOP Conference Series: Materials Science and Engineering, Vol. 896(1) (2020) DOI: 10.1088/1757-899X/896/1/012053 [Google Scholar]
  16. M. Kuzhin, M. Akimockina, Optimization of construction parameters using resource scheduling in E3S Web of Conferences, Vol. 97 (2019) DOI: 10.1051/e3sconf/20199706030 [CrossRef] [EDP Sciences] [Google Scholar]
  17. L.V. Volkova, The influence of probabilistic conditions on organizational and technological solutions at construction of residential buildings in Bulletin of Civil Engineers, Vol. 4 (51), pp. 87–95 (2015) [Google Scholar]
  18. N.Yu. Startseva, Modeling the parameters of organizational and technological building reliability of gas industry extended objects in Bulletin of Civil Engineers, No. 2 (49), pp. 96–101 (2015) [Google Scholar]
  19. S.V. Nikonorov, A.A. Melnik, Improvement of Organizational and Technological Reliability of Construction in Modern Conditions in Bulletin of the South Ural State University, Ser. Construction Engineering and Architecture, Vol. 19, No. 3, pp. 19–23 (2019) DOI: 10.14529/build190303 [CrossRef] [Google Scholar]
  20. D.R. Absalyamov, Improving the engineering systems reliability by formalizing the failure search in Magazine of Civil Engineering, No. 2, pp. 39–47 (2012) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.