Issue |
E3S Web Conf.
Volume 283, 2021
2021 3rd International Conference on Civil, Architecture and Urban Engineering (ICCAUE 2021)
|
|
---|---|---|
Article Number | 01019 | |
Number of page(s) | 4 | |
Section | Research on Civil Engineering and Geotechnical Hydrological Structure | |
DOI | https://doi.org/10.1051/e3sconf/202128301019 | |
Published online | 07 July 2021 |
Research on Influence of Deep Foundation Pit Excavation and Dewatering on Pile Foundation of Railway Bridge
Tianjin Port Engineering Institute Company LTD. Of CCCC, CCCC First Harbour Engineering Company Ltd., Key Laboratory of Port Geotechnical Engineering of Ministry of Communications, Key Laboratory of Port Geotechnical Engineering of Tianjin, Tianjin 300222, China
* Corresponding author: liutianyun@tpei.com.cn
The three-dimensional numerical model of the foundation pit engineering is established, and the fluid-structure coupling method is used to calculate the settlement of the pile foundation of the adjacent railway bridge caused by the excavation and dewatering of the foundation pit. The results show that the settlement range of the soil around the foundation pit reaches 140m, and the pile foundation of the railway bridge is within the influence range, but the maximum settlement value does not exceed the limit value specified in the design. The method used in this paper provides effective guidance for the construction optimization of the same type of projects and reduces the project cost.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.