Calculation methodology for determining the number of simultaneous self-starting pumping units
1
Tashkent State Technical University named after Islam Karimov University street №2, Tashkent city ; Uzbekistan
2
Karshi Institute of Engineering and Economics
* Corresponding author: abidoff@rambler.ru
The paper considers the methodology of calculating the number of self-starting pump units depending on the network voltage landing and the basic calculation dependencies of the process of selfstarting of electric motors supplied from three-phase three-winding transformer; the substitution scheme for one phase of the circuit is made. Technical solutions for upgrading pump units, which allow applying the selfstart mode at ameliorative pumping stations, are proposed.
Key words: Self-start / transient / reclamation pumping stations / pump unit / electrical equipment / starts / emergency shutdowns / pipeline / free-running / shutdown / power equipment / electric drive / induction motor / power system / power line / self-start device
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.