Rational parameters of the transportless technological scheme for the development of strata with maximum permissible dip angle
1 Mezhdurechensk Branch of T.F. Gorbachev Kuzbass State Technical University, 652877 Mezhdurechensk, 36 Stroitelei av., Russian Federation
2 Mathematical Institute, Slovak Academy of Sciences, 81473 Bratislava, Stefanikova 898/49, Slovakia
* Corresponding author: gvozdkovatn@kuzstu.ru
In this article the rational value of overburden cut width and thickness of transportless overburden at mining of two dispersed flat seams IV-V and VI at Kureinsky section of Sibirginsky open pit mine are presented, which makes it possible to minimize the volume of rock re-excavation under the condition of the planned annual productivity of coal on the open pit and to ensure reduction of stripping costs. This task is complicated by the fact that the dip angle at the section is close to the limit on the condition of the possibility of spoiling of internal dump, and since the overburden rocks of the section are represented mainly by large-block sandstones on the clay cement and siltstones and their compressive strength is 60-80 MPa, then it is required to use a drilling and blasting method of their preparation for excavation. Under such conditions, optimizing the parameters of the transportless excavation scheme is of special importance for effective mining of the section.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.