Research on Monitoring Information Management of Deep Foundation Pit Engineering Based on BIM Technology
1 Shaanxi Provincial Land Engineering Construction Group Co., Ltd., Xi’an, China
2 Institute of Land Engineering and Technology, Shaanxi Provincial Land Engineering Construction Group Co., Ltd., Xi’an, China
3 Key Laboratory of Degraded and Unused Land Consolidation Engineering, the Ministry of Natural Resources, China
4 Shaanxi Provincial Land Consolidation Engineering Technology Research Center, China
* Corresponding author: 694298560@qq.com
With the rapid development of construction industry, there are more and more deep and large foundation pit projects with complex architectural environment and geological conditions. Deformation monitoring in deep foundation pit as a basic element of engineering quality assurance is becoming more and more important. At present, the management and expression form of monitoring data in deep foundation pit still stays in the stage of two-dimensional form and curve expression, and it can not reflect the deformation of deep foundation pit in real, fast and effective way.Take the 3#, 4# high-rise residential and underground garage project of a college in Xi'an as an example. Based on Revit software, taking BIM technology and Revit API as the theoretical basis, and taking Microsoft Visual Studio 2012 and Autodesk Revit 2014 as the development platform, we use C# programming language to carry out the two development of information management module for deep foundation pit engineering monitoring. Combining BIM technology with monitoring data management of deep foundation pit, the information management mode of monitoring data of deep foundation pit is improved, which makes express expression of deep foundation pit construction monitoring more rapid and effective, and has guiding significance for safety construction of deep foundation pit engineering.
Key words: BIM / deep foundation pit engineering / monitoring management / Revit API / secondary development
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.