Gestion coordonnée des barrages du bassin du Niger
Coordinated management of Niger River basin dams
1 Office international de l’Eau (OiEau) – 21 rue de Madrid, 75008 Paris, France
2 CACG - Chemin de Lalette, 65004 Tarbes, France
3 Autorité du Bassin du Niger (ABN) – 288 Avenue du Fleuve Niger Plateau, Niamey, Niger
4 ISL Ingénierie – 25-27 rue Lenepveu, 49100 Angers, France
* Corresponding author: c.brachet@oieau.fr
Le bassin du Niger représente un important potentiel de développement régional, en particulier s’agissant de l’irrigation et de l’hydroélectricité. Un enjeu majeur pour l’Autorité du Bassin du Niger (ABN) et ses neuf États membres est la cohérence globale de l’aménagement du bassin et de sa gestion. Les grands barrages structurants existants sont Sélingué au Mali, Kandadji au Niger, Kainji, Jebba, Shiroro, Dadin Kowa au Nigeria et Lagdo au Cameroun. Les projets en cours sont ceux de Fomi et Taoussa en Guinée et au Mali. L’Annexe 2 à la Charte de l’eau de l’ABN relative au Règlement d’eau pour la gestion coordonnée des barrages structurants a été élaborée en 2019 par le groupement CACG – OIEau – Nodalis - ISL et validée fin 2019 par le Conseil des Ministres de l’ABN. Sa mise en application repose sur une actualisation du modèle d’allocation des ressources en eau de l’ABN et sur un outil de gestion tactique. Outre le recueil des données et l’opérationnalisation des prévisions, les améliorations possibles de la gestion coordonnée des barrages du bassin du Niger concernent en particulier la mise en oeuvre du Comité Technique Permanent de l’ABN, en charge de l’application du Règlement de gestion coordonnée. Plus généralement une organisation institutionnelle cohérente est nécessaire, ainsi qu’une reconnaissance justifiée du rôle de l’ABN.
Abstract
The Niger River Basin represents a significant potential for regional development, particularly in the areas of irrigation and hydroelectricity. A major challenge for the Niger Basin Authority (NBA) and its nine Member States is the overall coherence of the basin development and management. The existing large dams are Selingue in Mali, Kandadji in Niger, Kainji, Jebba, Shiroro, Dadin Kowa in Nigeria, and Lagdo in Cameroon. Current projects are Fomi and Taoussa in Guinea and Mali. Annex no.2 to the Niger basin water charter relating to the water regulations for the coordinated management of the structuring dams was drawn up in 2019 by the CACG - IOWater - Nodalis - ISL group and validated at the end of 2019 by the NBA Council of Ministers. Its implementation is based on an update of the NBA water resource allocation model and on a tactical management tool. In addition to data collection and operational forecast production, possible improvements in the coordinated management of Niger Basin large dams include the implementation of the NBA Permanent Technical Committee, in charge of the application of the coordinated management regulations. More generally, a coherent institutional organization is necessary, as well as a justified recognition of the role of the NBA.
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.