Issue |
E3S Web Conf.
Volume 352, 2022
7th International Conference on Energy Science and Applied Technology (ESAT 2022)
|
|
---|---|---|
Article Number | 01053 | |
Number of page(s) | 4 | |
Section | Fossil Energy & Geological Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202235201053 | |
Published online | 27 June 2022 |
Study on technical measures to improve oil recovery during extra high water cut period
Follow-up Water Flooding Room, Institute of Geology, No.6 Oil Production Plant, Daqing Oilfield Company Limited, Heilongjiang Daqing 163713, China
China’s petroleum resources are mainly continental facies with high petroleum density. Due to high heterogeneity, mining by traditional methods is not effective, and nearly half of the resources are not developed. The onshore oil fields that have been developed in Daqing area; Liaohe, Shengli and other large oil fields have entered high water cut stage, but there are still a lot of problems such as scattered remaining oil distribution, flooded reservoir, low recovery factor, reduced production and poor economic benefits. Based on this, this paper mainly analyzes the related technical measures to enhance oil recovery in the ultra-high water cut period.
Key words: Oilfield / Extra high water cut stage / recovery
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.