Analysis and treatment of large-scale nuclear heating commissioning problems
1 Shandong Nuclear Power Company Ltd, Yantai, 265100, China
2 SPIC Power Station Operation Technology (Beijing) Co., Ltd., Beijing 112209, China
Through the modification of a nuclear power plant, the extraction steam on the exhaust pipe of the high-pressure cylinder of the steam turbine is used to heat the circulating water of the heat network, and the pressurized anf heated circulating water of the heat network is supplied to the secondary thermal power station, and then supplied to various users after heat exchange, realizing the first large-scale nuclear heating in China. This paper introduces the function and process of nuclear heating system, and focuses on the analysis of the problems in the commissioning process, which provides a reference for the commissioning of other domestic nuclear power plants after nuclear heating modification.
Key words: nuclear power / heating / commissioning
© The Authors, published by EDP Sciences, 2022
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.