Issue |
E3S Web Conf.
Volume 370, 2023
3rd International Symposium on Energy Environment and Green Development (EEGD 2022)
|
|
---|---|---|
Article Number | 02003 | |
Number of page(s) | 7 | |
Section | Environmental Management Engineering and Green Development | |
DOI | https://doi.org/10.1051/e3sconf/202337002003 | |
Published online | 16 February 2023 |
Control Strategy and Economic Benefit Analysis of Wind Turbine Blade Replacement
1
Datang Northeast Electric Power Test & Research Institute Co., Ltd.
2
Dalian Datang Haipai New Energy Co., Ltd
* Email: ykj765240712@163.com
This paper takes a 1.5 MW wind turbine wind farm in Jilin province as an example. It analyzes the improvement of blade lengthening in wind turbine power generation by optimizing control strategy and adopting intelligent control technology. And it compares the economic benefits of replacing 82 blades and 89 blades and provides a theoretical and practical basis for blade lengthening transformation of other wind farms.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.