Research on the risk of Metro PPP projects based on DEMATEL-ANP
Department of Mechanical and Transport Engineering, Ordos Institute of Technology, Ordos, China
* LXY0301@oit.edu.cn
a wu_ruiping@oit.edu.cn
b wang_hongxiaooit@126.com
The risk of metro PPP project has the characteristics of complexity and diversity, and the introduction of social capital in the project further aggravates the complexity of metro PPP project. Based on the particularity of metro PPP projects, this paper identifies 27 indicators suitable for the risk research of such projects; the internal relationship between risk indicators is established by using Decision Making Trial and Evaluation Laboratory (DEMATEL), the weight of risk indicators is determined by using analytic network process (ANP), and a risk research model based on ANP is proposed; the risk of metro PPP project is realized according to typical case. The results show that policy is the indicator with both the highest centrality and influence, while geological conditions is the indicator with the highest causality, and the most easily affected factor is construction cost; construction cost and project overdue are the most important indicators among the 27 indicators.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.