Issue |
E3S Web Conf.
Volume 470, 2023
IVth International Conference “Energy Systems Research” (ESR-2023)
|
|
---|---|---|
Article Number | 01045 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/e3sconf/202347001045 | |
Published online | 21 December 2023 |
Approaches to solving the problems of development of Irkutsk power system and improving the reliability of consumers power supply
Melentiev Energy Systems Institute SB RAS, 664033 Lermontov str., 130, Irkutsk, Russia
* Corresponding author: osakalexey@mail.ru
In the power system of the Irkutsk region since 2020, there has been a significant increase in the maximum electrical load, which amounted to more than 1.2 GW. As a result, the available reserves of power generating capacity and capacity of power grid were exhausted. In the coming years, situations of occurrence of an uncovered power shortage during periods of maximum loads are possible. It is proposed to solve the problems by increasing the flexibility of the power system, reducing the peak consumption and levelling the load schedule, including through price-dependent demand response for electric energy and power through the development of regulatory legal acts in the field of electricity supply, technological connection and improving the payment system for electricity and power, including at the level of utility and household consumers.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.