Issue |
E3S Web Conf.
Volume 375, 2023
8th International Conference on Energy Science and Applied Technology (ESAT 2023)
|
|
---|---|---|
Article Number | 01030 | |
Number of page(s) | 4 | |
Section | Fossil Energy & Geological Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202337501030 | |
Published online | 27 March 2023 |
Analysis of the exploitation potential of well DA1
Geological Management Office, Geological Technology Research Institute, Gas Production Company of Daqing Oilfield Co., LTD. (Gas Storage Company),
Daqing Heilongjiang 163000, China
DA1 well exploited two sets of reservoirs, volcanic rock of Ying1 member and conglomerate of Ying4 member. In the initial stage of exploitation, the well had a high productivity. After an operation in 2010, the production situation of the well changed dramatically. In this paper, through the comparison of the production situation before and after the operation, the geological situation and the adjacent well, the operation pollution situation of the well is analyzed, and the exploitation potential of the well is analyzed, the measure scheme of plugging removal is put forward, and the stimulation prediction and economic benefit evaluation of the well are carried out, proving that the measure is effective and feasible.
Key words: Operation pollution / mining potential / plugging removal
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.