Issue |
E3S Web of Conf.
Volume 393, 2023
2023 5th International Conference on Environmental Prevention and Pollution Control Technologies (EPPCT 2023)
|
|
---|---|---|
Article Number | 01019 | |
Number of page(s) | 4 | |
Section | Environmental Assessment and Urban and Rural Resource Planning | |
DOI | https://doi.org/10.1051/e3sconf/202339301019 | |
Published online | 02 June 2023 |
Multiple regression analysis of the impact of market incentive environmental regulation on mining industry structure based on stata software
China Academy of Natural Resources Economics, Beijing, China
* Corresponding author e-mail: snowcherry619@sohu.com
Based on the provincial panel data of 30 provinces except Xizang from 2006 to 2017, this study constructs a multiple regression analysis model with the optimization of mining industry structure as the explained variable, market incentive environmental regulation as the explanatory variable, and technological innovation, enterprise access, foreign direct investment, market demand for mineral products, and resource endowment of mineral resources as the control variable. In addition, stata15.0 software was used to empirically analyze the influence of market incentive environmental regulation on the adjustment of mining industry structure at the national level, and to compare and analyze the influence of market incentive environmental regulation on the optimization of mining industry structure in the eastern coastal areas and the central and western regions. Finally, according to the results of regression analysis, corresponding suggestions are put forward.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.