Issue |
E3S Web Conf.
Volume 399, 2023
International Conference on Newer Engineering Concepts and Technology (ICONNECT-2023)
|
|
---|---|---|
Article Number | 03010 | |
Number of page(s) | 6 | |
Section | Material Science | |
DOI | https://doi.org/10.1051/e3sconf/202339903010 | |
Published online | 12 July 2023 |
Experimental investigation of Green Concrete
1 Professor, Department of Civil Engineering, M. Kumarasamy College of Engineering, Karur, Tamil Nadu, India
2 UG students, Department of Civil Engineering, M. Kumarasamy College of Engineering, Karur, Tamil Nadu, India
* Corresponding author: civilvsk@gmail.com
Currently, construction costs and sand shortages are increasing day by day. To combat this problem, sand in plastic form is partially replaced by other materials. Plastic waste is recycled in the form of new production materials that can be used as optional components of concrete, making it one of the best ways to deal with plastic waste. These techniques have also proven to be much more cost-effective than traditional methods. This paper proposes using plastic waste as random substitutes (10%, 20%, 30%) for natural river sand and testing for compressive strength, tensile strength, flexural strength and sustainability. purpose. With the amount of plastic used increasing day by day, the disposal of used plastic is a big problem. It was therefore concluded that sand must be replaced by plastic within 20 years so that the shortage of natural aggregates can be effectively dealt with and the used plastic are disposed effectively.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.