Issue |
E3S Web of Conf.
Volume 401, 2023
V International Scientific Conference “Construction Mechanics, Hydraulics and Water Resources Engineering” (CONMECHYDRO - 2023)
|
|
---|---|---|
Article Number | 02050 | |
Number of page(s) | 8 | |
Section | Ecology, Hydropower Engineering and Modeling of Physical Processes | |
DOI | https://doi.org/10.1051/e3sconf/202340102050 | |
Published online | 11 July 2023 |
System for determining state of continuous welded track
Tashkent State Transport University, Tashkent, Uzbekistan
* Corresponding author: galiaskar1991@bk.ru
The article considers the main disadvantages of the existing method of examining the lashes of a jointless path, in which a pedestrian bypass of the sections of the canvas and their visual control is performed. A system for monitoring the temperature stresses of jointless rail lashes laid in the path is proposed, which allows monitoring the longitudinal displacement of the track throughout the entire life cycle: from the moment the rails are welded into long-length lashes, including their laying, and throughout further operation. The system makes it possible to monitor compliance with the optimal fixing temperature of rail lashes during their laying, welding and fixing, based on data obtained with the help of sensors, to determine the actual fixing temperature in the lashes of a jointless track; to control the optimal fixing temperature of rail lashes in areas of restoration of their integrity.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.