Issue |
E3S Web of Conf.
Volume 410, 2023
XXVI International Scientific Conference “Construction the Formation of Living Environment” (FORM-2023)
|
|
---|---|---|
Article Number | 02014 | |
Number of page(s) | 7 | |
Section | Reliability of Buildings and Constructions | |
DOI | https://doi.org/10.1051/e3sconf/202341002014 | |
Published online | 09 August 2023 |
Monitoring of geotechnical and underground construction facilities as part of risk management
Moscow State University of Civil Engineering, Yaroslavskoye shosse, 26, 129337, Moscow, Russia
* Corresponding author: SelviyanSM@yandex.ru
Any construction of geotechnical and underground facilities is associated with risk factors. In order to manage these factors, a list of measures to reduce them must be provided at the project stage. One of the main measures is monitoring. The article describes an effective method of risk management by means of monitoring and scientific and technical project management, classifications of potential hazards for aboveground and underground construction are given. Using color gradation in tabular form the categories of hazards are given and the regulations and actions to reduce them are described. This paper describes in detail the results obtained at real objects during risk management by means of monitoring and scientific and technical support at each stage of construction.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.