Issue |
E3S Web Conf.
Volume 426, 2023
The 5th International Conference of Biospheric Harmony Advanced Research (ICOBAR 2023)
|
|
---|---|---|
Article Number | 02075 | |
Number of page(s) | 7 | |
Section | Innovative Management and Sustainable Society | |
DOI | https://doi.org/10.1051/e3sconf/202342602075 | |
Published online | 15 September 2023 |
Comparisonal Analysis of Formwork Costs Conventional, Semi-System and Aluminium on Shear Wall Work (Case Study: The Building of The Faculty of Art and Design Education)
Civil Engineering Department, Faculty of Engineering, Bina Nusantara University Jakarta, Indonesia 11480
* Corresponding author: aldhi.wiguna@binus.ac.id
Indonesia is one of the other countries with a high productivity level in the construction industry. As the construction industry increases, some things must be considered in construction management, namely cost, time, and quality. In this study, the authors focus on the analysis of formwork in terms of cost by using unit price analysis which refers to PUPR and unit prices in each province. This research resulted in an analysis of the formwork method, which is more cost-effective in the shear wall work of the Faculty of Art and Design Education Building. The results showed that using the aluminium formwork method has an average cost of 36% more economical than conventional methods, and semi-system methods.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.