Issue |
E3S Web Conf.
Volume 438, 2023
4th International Conference on Air Pollution and Environmental Engineering (APEE 2023)
|
|
---|---|---|
Article Number | 01015 | |
Number of page(s) | 6 | |
DOI | https://doi.org/10.1051/e3sconf/202343801015 | |
Published online | 26 October 2023 |
Feasibility Study on Frequency Conversion Transformation of Electric Feedwater Pump in Nuclear Power Plant
China Nuclear Power Technology Research Institute, Shenzhen, 518000, China
In order to study the feasibility of frequency conversion of electric feedwater pump in nuclear power plant, and to provide reference for the improvement of electric feedwater pump in nuclear power plant and new nuclear power plant, this paper discusses the technical and economic aspects, and analyzes the feasibility of frequency conversion transformation of electric feed pump in nuclear power plant. The results show that there is no technical difficulty for the electric feedwater pump of nuclear power plant from the technical point of view, and the economic analysis shows that it will take about 4 years to recover the cost for the frequency conversion of the electric feedwater pump of nuclear power plant. Therefore, the frequent participation in the peak load of the power grid units can be considered for transformation, For the nuclear power units that serve as the base load of the power grid, the cost can be recovered in about 6 years by eliminating the loss of capacity, and they can be retrofitted according to the needs of the plants themselves.
Key words: Electric feedwater pump / Frequency conversion / Transformation
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.