Issue |
E3S Web Conf.
Volume 471, 2024
XIV International Conference on Transport Infrastructure: Territory Development and Sustainability (TITDS-XIV-2023)
|
|
---|---|---|
Article Number | 02003 | |
Number of page(s) | 7 | |
Section | Engineering, Transport Energy Efficiency and Power Industry | |
DOI | https://doi.org/10.1051/e3sconf/202447102003 | |
Published online | 04 January 2024 |
Analysis of reliability of a prefabricated conductive rail joint in context of heavy traffic
1 Department “Automation, telemechanics and communication on railway transport”, Samara State Transport University (SSTU), Svobody Street 2V, Samara, 443066, Russia
2 Computer and Information Sciences Department, Povolzhskiy State University of Telecommunications and Informatics, Samara, 443010, Russia
3 Department of Chemistry and Combustion Processes, FSBEI HE Siberian Fire and Rescue Academy EMERCOM of Russia, Severnaya Street 1, Zheleznogorsk, Krasnoyarsk Krai, 662972, Russia
4 Departament of Mathematics, Moscow Polytechnic Unversity, 38 Bolshaya Semenovskaya Street, Moscow, 107023, Russia
* Corresponding author: alzolkin@list.ru
In this paper, the calculation of reliability indicators has been carried out in the article for two configurations of a prefabricated conductive rail joint: with fish plates, a welded and bypass connector, and a spring rail bond. The sections of the track where the probability of failure of the prefabricated conductive rail joint is increasing are identified. The destabilizing factors influencing the onset of failure of a prefabricated conductive rail joint earlier than the calculated values of the durability indicators are considered. A model for evaluating the reliability of the second configuration of a prefabricated conductive rail joint based on the Markov analytical model has been developed, and such reliability indicators have been calculated as the probability of its being in working condition, as well as the probability of failure of the prefabricated conductive rail joint due to the inoperability of the fish plates and the spring rail bond. The features of the configuration of a prefabricated conductive rail joint with a spring rail bond are taken into account, which consist in the fact that in order to eliminate the failure due to the inoperability of the spring rail bond, it is necessary to remove the fish plates.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.