Issue |
E3S Web of Conf.
Volume 490, 2024
5th International Symposium on Architecture Research Frontiers and Ecological Environment (ARFEE 2023)
|
|
---|---|---|
Article Number | 03015 | |
Number of page(s) | 4 | |
Section | Ecological Environment Restoration and Pollution Control | |
DOI | https://doi.org/10.1051/e3sconf/202449003015 | |
Published online | 14 February 2024 |
A subway tunnel under wear Chan river construction risk evaluation and control methods
School of Architecture and Civil Engineering, Xi'an University of Science and Technology, Xi'an Shaanxi 710054, China
* Corresponding author: 506396899@qq.com
Poor rich water sand flow plasticity and permeability coefficient, Angle of internal friction, etc. For effective control, avoid and reduce the subway next in action in the process of river construction risk, guarantee the construction task smoothly. For the construction of risk source analysis and identification of system construction of risk hierarchy, using analytic hierarchy process (ahp) and fuzzy comprehensive evaluation method to find the risk of subway construction. The results show that the construction has a "medium risk" and easy to rise to the "high risk".
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.