Issue |
E3S Web of Conf.
Volume 508, 2024
International Conference on Green Energy: Intelligent Transport Systems - Clean Energy Transitions (GreenEnergy 2023)
|
|
---|---|---|
Article Number | 08017 | |
Number of page(s) | 9 | |
Section | Sustainability and Decarbonization | |
DOI | https://doi.org/10.1051/e3sconf/202450808017 | |
Published online | 05 April 2024 |
Efficiency of reinforcement of transition sections on the railroad by the developed constructions
Tashkent State Transport University, Tashkent, Uzbekistan
* Corresponding author: m.mehmonov90@mail.ru
The article gives the reasons of occurrence and origin of defects of railroad track structure elements on approaches to bridges. The defects arising on sleepers and intermediate fasteners of the track structure and the costs obtained as a result of early replacement of the track structure elements on the transition sections are calculated. As a result of the received constructive decision the technological process of driving of reinforced concrete piles in an embankment for the purpose of maintenance of safe and reliable work of sleepers and intermediate fastenings during service life in 3 m on a transition section is developed. As a result of implementation of the developed design in 1384 transition sections, the economic efficiency amounted to 447.638 million sums. As a result of reinforcement of the transition section, the cost of current and lifting repair of the track is reduced.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.