Issue |
E3S Web Conf.
Volume 512, 2024
2024 International Conference on Urban Construction and Transportation (UCT 2024)
|
|
---|---|---|
Article Number | 03026 | |
Number of page(s) | 6 | |
Section | Traffic Construction Engineering and Transportation Optimization | |
DOI | https://doi.org/10.1051/e3sconf/202451203026 | |
Published online | 10 April 2024 |
Research on Highway Maintenance and Management Cost Based on Life Cycle Cost Analysis
China Automotive Technology & Research Center Co. Ltd, Tianjin, China
a* Corresponding author: lijiarong@catarc.ac.cn
b goulijuan@catarc.ac.cn
c menfeng@catarc.ac.cn
With the rapid development of China’s highway construction, the huge demand for funds and the lack of financial strength of the contradiction is increasingly obvious, can effectively control the maintenance costs, highway operators to obtain sustainable development advantages of the key factors. This paper measures the highway maintenance and management costs including carbon emission costs based on the perspective of life cycle cost analysis. Based on the perspective of life cycle cost analysis, prediction models are developed for each component cost of highway maintenance and management costs. The carbon emission costs generated during the operation duration of highways are also included in the life-cycle costs, and the calculation model is proposed for the strategy of “30∙60 carbon target” in China. In the example analysis, the carbon emission cost of new energy vehicles is only 3/4 of that of fuel vehicles in the driving phase; more than 90% of the carbon emission is generated by the driving vehicles.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.