Issue |
E3S Web Conf.
Volume 526, 2024
Mineral Resources & Energy Congress (SEP 2024)
|
|
---|---|---|
Article Number | 01007 | |
Number of page(s) | 11 | |
DOI | https://doi.org/10.1051/e3sconf/202452601007 | |
Published online | 20 May 2024 |
Geological and technological viewpoint on 3D Deposit Model – examples of use in Pniówek Coal Mine
1 KWK Pniówek, 18 Krucza St., 43-251 Pawłowice, Poland
2 Mineral and Energy Economy Research Institute, Polish Academy of Sciences, 7A Wybickiego St., 31-261 Cracow, Poland
* Corresponding author: jkulpa@meeri.pl
During the more than 3 years of the “Quality” program at JSW S.A., a geological database has been built from scratch, collecting data from all exploratory boreholes, roadway profiling and the results of chemical analyses in one place – placing particular emphasis on parameters affecting the quality of coke. Working with digital databases requires new competencies for geologists – the ability to efficiently obtain information ready for further processing. As intended, the geological model became the basis for forecasting the quantity and quality of mined coal used in coke production. In the course of the work, a discrepancy became apparent between the geological interpretation of the structure of the deposit – as understood by the assumptions of the geological documentation, and the technological conditions of mining. The article presents resulting changes in the approach to modeling lithology and quality parameters. In addition, examples of the application of the geological database and the geological model in the daily work of the geological department are presented.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.