Issue |
E3S Web Conf.
Volume 528, 2024
2024 3rd International Symposium on New Energy Technology Innovation and Low Carbon Development (NET-LC 2024)
|
|
---|---|---|
Article Number | 02002 | |
Number of page(s) | 7 | |
Section | Smart Grid and Hydropower Resources Development | |
DOI | https://doi.org/10.1051/e3sconf/202452802002 | |
Published online | 28 May 2024 |
Research on methods and scale of deeply exploitable hydropower resources
PowerChina Huadong Engineering Corporation Limited, Hangzhou 311122, China
* Corresponding author’s e-mail: wang_f6@hdec.com
Deep development of hydropower is an important measure to optimize the structure of clean energy, meet the peak shaving and backup needs of the power system, and achieve the national dual carbon goals. This article conducts a systematic analysis of the development potential of developed and undeveloped hydraulic resources, including unplanned river sections, undeveloped planned power stations, unit renovation and capacity expansion, and the expansion of existing/ongoing power stations. We focused on studying the factors that affect the deep development of hydropower, including the reasonable operation mode of hydropower with different regulation performance in the power grid, the energy structure characteristics of the power system, and the comprehensive water use requirements. A calculation method for the reasonable installation and utilization hours and deep development resources of hydropower stations with different regulation performance after deep development has been proposed. According to calculations, Zhejiang Province can increase its scale by 3331MW, with great potential for deep development.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.