Issue |
E3S Web Conf.
Volume 528, 2024
2024 3rd International Symposium on New Energy Technology Innovation and Low Carbon Development (NET-LC 2024)
|
|
---|---|---|
Article Number | 03021 | |
Number of page(s) | 4 | |
Section | Carbon Emission Research and Sustainable Development | |
DOI | https://doi.org/10.1051/e3sconf/202452803021 | |
Published online | 28 May 2024 |
Optimization of Initial Carbon Emission Allowance Allocation in Industrial Industries: A Case Study of Zhejiang Province, China
Shanghai University of Electric Power, Energy and Environment Engineering Institute, Shanghai, China
a 1031169209@qq.com
b liqifen73@163.com
c yangyongwen@vip.163.com
d dengjunkai826@163.com
The construction of carbon market is one of the important means for China to reach the goal of carbon peaking and carbon neutrality, and the allocation of initial carbon emission right quota is the key link in carbon market transaction. At present, the historical method is the commonly used allocation method of initial carbon emission rights in China, and the use of this method is unfair and inefficient. Therefore, this paper proposes an allocation optimization model, selects a number of indicators, and optimizes the allocation of initial carbon emission rights based on the hierarchical analysis method and entropy weight method. Example analysis shows that the allocation optimization model helps to share the carbon emission responsibility and improve the allocation efficiency, realizes the optimal allocation of initial carbon emission rights among industrial sectors, and provides support for the emission reduction of industrial sectors.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.