Issue |
E3S Web Conf.
Volume 569, 2024
GeoAmericas 2024 - 5th Pan-American Conference on Geosynthetics
|
|
---|---|---|
Article Number | 06002 | |
Number of page(s) | 6 | |
Section | Landfills 1 | |
DOI | https://doi.org/10.1051/e3sconf/202456906002 | |
Published online | 19 September 2024 |
Influence of temperature and stress in the transmissivity of GCD used in landfills
GeoEngineering Centre at Queen’s-RMC, Queen’s University, Kingston, ON, Canada
* Corresponding author: juliana.reinert@queensu.ca
Twenty-one transmissivity tests were performed in a double composite liner contaminant barrier for landfills. The secondary drainage system was tested with three geocomposite drains with different geonet core structures, biplanar, triplanar, and triaxial. Half of the tests were conducted under normal applied load of 250 kPa and varying temperatures of 30, 65, 75 and 85oC, to simulate different temperatures commonly found in the liner. The other half was performed at 30oC and varying applied stresses of 50, 150, 250 and 350 kPa, to simulate different heights of waste on top of the liner. The triaxial and triplanar GCDs presented similar but higher than the biplanar, rate of decrease in the flow rate with increasing temperature at 250 kPa. The highest the temperature of the liner, the smallest the flow rate of the geocomposite drain, but with a faster rate between 30-65oC than between 65-85oC.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.