Issue |
E3S Web Conf.
Volume 569, 2024
GeoAmericas 2024 - 5th Pan-American Conference on Geosynthetics
|
|
---|---|---|
Article Number | 25001 | |
Number of page(s) | 8 | |
Section | Geosynthetics in Hydraulic and Filtration Applications | |
DOI | https://doi.org/10.1051/e3sconf/202456925001 | |
Published online | 19 September 2024 |
Large-scale testing of electro-osmosis with enhanced wick-drain techniques for dewatering iron mine tailing
Chiregan, Scarborough, ON, Canada
* Corresponding author: Mahmoudipour@gmail.com
In geotechnical engineering, two conventional methods, electro-osmosis, and wick drains (also known as prefabricated vertical drains or PVD), are commonly employed to mechanically enhance fine-grained saturated soils. This research aims to combine these two methods to develop a novel approach. Various configurations were examined, and comparisons were made between the new product and each method individually to identify the optimal configuration, pattern, and degree of improvement. Samples were collected from the thickener at the Golgohar iron ore mine and arranged into seven large-scale testing pools. Square and triangular patterns, along with constant and alternating poles, were investigated in this study. The results demonstrated that the combination of these technologies improved the mechanical properties, with the most significant enhancement in undrained shear strength observed in pools employing an enhanced Wick drain featuring constant poles and a triangular pattern.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.