Open Access
Issue |
E3S Web of Conferences
Volume 3, 2014
Emerging Technology for Sustainable Development Congress (ETSDC 2014)
|
|
---|---|---|
Article Number | 01023 | |
Number of page(s) | 6 | |
DOI | https://doi.org/10.1051/e3sconf/20140301023 | |
Published online | 14 August 2014 |
- Gann, “Building innovation - complex constructs in a changing world,” pp. 150–186, 2000. [Google Scholar]
- B. Succar, “Building information modelling framework: A research and delivery foundation for industry stakeholders,” Autom. Constr., vol. 18, no.3, pp. 357–375, May 2009. [Google Scholar]
- V. R. Perumal and A. H. A. Bakar, “communication in construction idustry.pdf,” World Appl. Sci. J., 2011. [Google Scholar]
- CREAM, “BIM Industrial Transformation in Australia,” 2012. [Online]. Available: http://www.cream.com.my. [Accessed: 01-Oct-2012]. [Google Scholar]
- J. V. Kumar and M. Mukherjee, “Scope of Building Information Modeling (BIM) in India,” vol. 2, no. 1, pp. 165–169, 2009. [Google Scholar]
- A. guide to the project management body of knowledge PMBOK, Project Management Body of Knowledge A Guide to the A Guide to the A Guide to the Project Body of Project Management Knowledge Management Body of Knowledge Knowledge, 2000 Editi. Project Management Institute, 2001. [Google Scholar]
- L. J. Goodman, Project planning and management. New York: Van Nostrand Reinhold Company Inc, 1988. [CrossRef] [Google Scholar]
- M. F. Hergunsel, “Benefit of Building Information Modelling for construction managers and BIM based scheduling,” Worcester Polytechnic Institute, 2011. [Google Scholar]
- E. W. East, “BIM for Construction Handover,” J. Build. Inf. Model., pp. 25–28. [Google Scholar]
- M. Reichardt, “Convergence of Standards,” J. Build. Inf. Model., pp. 36–38, 2007. [Google Scholar]
- Liu, “Feasibility Analysis of BIM Based Information System for Facility Management at WPI,” Worcester Polytechnic Institute, 2010. [Google Scholar]
- Jeffrey. A. Pinheiro, “List of BIM Software,” 2013. [Online]. Available: http://therevitkid.blogspot.com/2013/06/list-of-bim-software.html. [Accessed: 11-Oct-2013]. [Google Scholar]
- Broquestas, “List of BIM software & Providers,” 2010. [Online]. Available: http://www.cadaddict.com/2010/03/list-of-bim-software-providers.html. [Accessed: 01-Oct-2012]. [Google Scholar]
- R. Rohena, “Building Information Modelling (BIM) Implementation in Naval Construction,” Lousiana State University, 2011. [Google Scholar]
- R. F. Saen, “The Use of Artificial Neural Networks for Technology Selection in the Presence of Both Continuous and Categorical Data,” vol. 6, no. 9, pp. 1177–1189, 2009. [Google Scholar]
- M. Salehi, “Application of Fuzzy TOPSIS Technique for Evaluation of Project,” World Appl. Sci. J., vol. 6, no. 6, pp. 776–783, 2009. [Google Scholar]
- D. Sedighizadeh and S. Sedighizadeh, “A Consolidted MADM Method under Uncertainly for Strategic Resource Planning,” World Appl. Sci. J., vol. 13, no. 7, pp. 1661–1667, 2011. [Google Scholar]
- S. Sorooshian, A. Anvari, Salimi M., and E. Falatoonitoosi, “Interrelation Study of Entrepreneur’s Capability 1,2,” vol. 17, no. 7, pp. 818–820, 2012. [Google Scholar]
- M. Gholampour and M. Alvandi, “Order Preference of Efficient Stakeholders on Organization Effectiveness and Their Related Goals via TOPSIS,” World Appl. Sci. J., vol. 10, no. 5, pp. 494–507, 2010. [CrossRef] [Google Scholar]
- E. Ataei and A. Branch, “Application of TOPSIS and Fuzzy TOPSIS Methods for Plant Layout Design,” vol. 24, no. 7, pp. 908–913, 2013. [Google Scholar]
- P. Adhikary, S. Kundu, P. K. Roy, and A. Mazumdar, “Optimum selection of Hydraulic Turbine Manufacturer for SHP: MCDA or MCDM Tools,” World Appl. Sci. J., vol. 28, no. 7, pp. 914–919, 2013. [Google Scholar]
- B. Kalantari, H. Mehrmanesh, and N. Saeedi, “Ranking the Driving Affecting Factors on Management Accounting: Business Intelligence Approach,” World Appl. Sci. J., vol. 20, no. 8, pp. 1147–1151, 2012. [Google Scholar]
- A. R. Moghassem, “Comparison among Two Analytical Methods of Multi-Criteria Decision Making for Appropriate Spinning Condition Selection,” World Appl. Sci. J., vol. 21, no. 5, pp. 784–794, 2013. [Google Scholar]
- J. M. Ruiz, “BIM Software evaluation model for general contractors,” Universty of Florida, 2009. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.