Open Access
Issue |
E3S Web Conf.
Volume 33, 2018
High-Rise Construction 2017 (HRC 2017)
|
|
---|---|---|
Article Number | 03074 | |
Number of page(s) | 9 | |
Section | 3 Construction Technology and Management | |
DOI | https://doi.org/10.1051/e3sconf/20183303074 | |
Published online | 06 March 2018 |
- M. Carvalho, R.J. Rabechini, Impact of risk management on project performance: the importance of soft skills. International Journal of Production Research 53(2), 321-340 (2015) [Google Scholar]
- M. Mbaidheen, A. Alawneh, Assessing the risk of corporate strategic change. International Journal of Information, Business and Management 9(1), 45-56 (2017) [Google Scholar]
- P. Huber, E. Ronchetti, Robust statistics, second ed. J. Wiley, New Jersey.(2009) [Google Scholar]
- K. Yuan, W. Chan, Y. Tian, Expectation-robust algorithm and estimation equations for means and dispersion matrix with missing data. Ann. Inst. Math. 68, 329-351.(2016) [Google Scholar]
- K. Yuan,. X. Zhong, Outliers, leverage observations and influential cases in factor analysis: using robust procedures to minimize their effect. Sociological Methodology 38, 329-368(2008) [CrossRef] [Google Scholar]
- A. Toman, Robust confirmatory factor analysis based on the forward search algorithm. Stat. Papers 55, 233-252 (2014) [Google Scholar]
- V. Todorov, Robust selection of variables in linear discriminant analysis. Stat. Math. & Appl 15, 395-407 (2007) [Google Scholar]
- J. Nevolainen, S. Datta, H. Ojc, Inference on the marginal distribution of clustered data with informative cluster size. Stat. Papers 55, 71-92 (2014) [CrossRef] [Google Scholar]
- P. Cizak, Efficient robust estimation of regression models. Comput. Stat. Data Anal 55, 774-788 (2011) [CrossRef] [Google Scholar]
- C. Agostinelli, A. Leung, V. Yohair, R. Zomer, Robust estimation of multivariate location and scatter in the presence of cellwise and casewise contamination. TEST 24, 441-461 (2015) [CrossRef] [Google Scholar]
- S. Morgenthaler, A survey of robust statistics. Stat. Math. & Appl. 15, 271-293(2007) [CrossRef] [Google Scholar]
- B Titarenko, System approach to the project risk management. Vestnik MGSU 5, 340-343 (2011) [Google Scholar]
- B. Titarenko, S. Titov, R. Titarenko, Applied Mechanics and Materials 638-640, 2338-2341 (2014) [CrossRef] [Google Scholar]
- G. Bubnov, B. Titarenko, S. Titov. R. Titarenko, Isorisk curves as a tool for increasing flexibility of risk management in engineering projects. Contemporary Engineering Sciences 8(21), 991-999 (2015) [CrossRef] [Google Scholar]
- A. Volkov, A Sedov, P Chelyshkov., B. Titarenko., G. Malyha, E. Krylov, Research Journal of Pharmaceutical, Biological and Chemical Sciences 7(3), 2416-2420 (2016) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.