Open Access
Issue
E3S Web Conf.
Volume 56, 2018
VII International Scientific Conference “Problems of Complex Development of Georesources” (PCDG 2018)
Article Number 01007
Number of page(s) 5
Section Geotechnological Problems of Development of Subsoil
DOI https://doi.org/10.1051/e3sconf/20185601007
Published online 26 September 2018
  1. Wirtgen surface mining for selective limestone mining in the North Caucasus / Russia. Zement-Kalk-Gips Int. 67, 10, p. 18. (2014). [Google Scholar]
  2. A. Iu. Cheban The application of milling machines in construction and mining or construction materials // Bulletin of Pacific national university. 3. pp 105-108. (2012). [Google Scholar]
  3. E.E. Shvabenland Concerning the potential of continuous milling machines with the development deposits by open-cut mining // Rational subsoil development. 1. pp 54-60. (2014). [Google Scholar]
  4. M. Pikhler, Ui B. Pankevich Directions of development and results of the application of miners by Wirtgen Surface Miner at open-cuts and open-casts of the world // Mining industry. 3. pp 42-45. (2000). [Google Scholar]
  5. A.R. Mattis et al. Blastless technologies for open-cut mining of solid minerals. Novosibirsk: Publishing house of Siberian Branch of Russian Academy of Sciences, p. 337. (2007). [Google Scholar]
  6. Iu.B. Pankevich, G. Khartman Experience of surface miners by company Wirtgen on plaster quarries of the world // Mining industry. 1. pp 4-9. (1997). [Google Scholar]
  7. Drebenshtedt K., Pessler C. Calculation methods for mining machines. Materials of the international conference “Forum of miners - 2006”. D: National mining University. pp. 26-32. (2006). [Google Scholar]
  8. K.N. Trubetskoi, M.G. Potapov, K.E. Vinitskii, N.N. Melnikov et al.. Open-cut mining. Bureau of Mines. p. 590. (1994). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.