Open Access
Issue
E3S Web Conf.
Volume 60, 2018
Ukrainian School of Mining Engineering
Article Number 00037
Number of page(s) 8
DOI https://doi.org/10.1051/e3sconf/20186000037
Published online 16 October 2018
  1. Pivnyak, G.G., & Shashenko, O.M. (2015). Innovations and safety for coal mines in Ukraine. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (6), 118–121. [Google Scholar]
  2. Bondarenko, V.I., Rudenko, H.K., & Medyanik, V.Yu. (2017). Ugol’naya shahta. Dnipropetrovsk: Natsionalnyi hirnychyi universytet. [Google Scholar]
  3. Bondarenko, V., Kovalevs’ka, I., & Fomychov, V. (2012). Features of carrying out experiment using finite-element methodat multivariate calculation of mine massif – combined support system. Geomechanical Processes During Underground Mining, 7–13. https://doi.org/10.1201/b13157-3 [Google Scholar]
  4. Petlovanyi, M.V., Lozynskyi, V.H., Saik, P.B., & Sai, K.S. (2018). Modern experience of low-coal seams underground mining in Ukraine. International Journal of Mining Science and Technology. Article in press https://doi.org/10.1016/j.ijmst.2018.05.014 [Google Scholar]
  5. Chetverik, M.S., Bubnova, E.A., & Soroka, Yu.N. (2013). Prichiny obrazovaniya i napravleniya likvidatsii provalov ot gornykh vyrabotok. Heotehnichna mekhanika, (111), 193–205. [Google Scholar]
  6. Strilets, O., Pcholkin, G., & Oliferuk, V. (2015). Monitoring of mass blasting seismic impact on residencial buildings and constructions. Theoretical and Practical Solutions of Mineral Resources Mining, 441–443. [Google Scholar]
  7. Shirin, L.N., Denishchenko, A.V., Yurchenko, O.O., & Mikhalev, D.V. (2012). Methodology for determination of rope vehicles energy consumption. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (4), 464–469. [Google Scholar]
  8. Cherniaiev, O.V. (2017). Systematization of the hard rock non-metallic mineral deposits for improvement of their mining technologies. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (5), 11–17. [Google Scholar]
  9. Shyrin, A., Rastsvetaev, V., & Morozova, Т. (2012). Estimation of reliability and capacity of auxiliary vehicles while preparing coal reserves for stoping. Geomechanical Processes during Underground Mining: School of Underground Mining 2012, 105–108. https://doi.org/10.1201/b13157-18 [Google Scholar]
  10. Huang, F., Luo, X., & Liu, W. (2017). Stability Analysis of Hydrodynamic Pressure Landslides with Different Permeability Coefficients Affected by Reservoir Water Level Fluctuations and Rainstorms. Water, 9(7), 450. https://doi.org/10.3390/w9070450 [CrossRef] [Google Scholar]
  11. Gorova, A., Pavlychenko, A., Kulyna, S., & Shkremetko, O. (2012). Ecological problems of postindustrial mining areas. Geomechanical Processes During Underground Mining: School of Underground Mining 2012, 35–40. https://doi.org/10.1201/b13157-7 [CrossRef] [Google Scholar]
  12. Gorova, A., Pavlychenko, A., Borysovs’ka, O., & Krups’ka, L. (2013). The development of methodology for assessment of environmental risk degree in mining regions. Annual Scientific-Technical Collection – Mining of Mineral Deposits, 207–209. https://doi.org/10.1201/b16354-38 [CrossRef] [Google Scholar]
  13. Falshtynskyi, V.S., Dychkovskyi, R.O., Saik, P.B., Lozynskyi, V.H., & Cabana, E. (2017). Formation of thermal fields by the energy-chemical complex of coal gasification. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (5), 36–42. [Google Scholar]
  14. Lozynskyi, V., Dychkovskyi, R., Saik, P., & Falshtynskyi, V. (2018). Coal Seam Gasification in Faulting Zones (Heat and Mass Balance Study). Solid State Phenomena, (277), 66–79.https://doi.org/10.4028/www.scientific.net/SSP.277.66 [CrossRef] [Google Scholar]
  15. Bilyi Y.S., Dovbnich, M.M., Kuzina, G.P., & Stovas, G.M. (2004). Sposib vydilennia na ploshchi dilianok neodnoridnoi budovy hruntovoho masyvu. Patent No. 64221, Ukraine. [Google Scholar]
  16. DBN А.2.1-1-2014. (2014). Inzhenerno-geologicheskie izyskaniya dlya stroitelstva. Kyiv: Ukrayinskyi derzhavnyi holovnyi naukovo-doslidnyi i vyrobnychyi instytut inzhenernotekhnichnykh i ekolohichnykh vyshukuvan. [Google Scholar]
  17. SOU 10.1.05400632.1:2004. (2004). Proekt likvidatsii vuhilnykh shakht Ukrainy. [Google Scholar]
  18. Malashkevych, D., Sotskov V., Medyanyk V. & Prykhodchenko D. (2018). Integrated Evaluation of the Worked-Out Area Partial Backfill Effect of Stress-Strain State of Coal-Bearing Rock Mass. Solid State Phenomena, (277), 213–220. https://doi.org/10.4028/www.scientific.net/ssp.277.213 [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.