Open Access
Issue
E3S Web Conf.
Volume 60, 2018
Ukrainian School of Mining Engineering
Article Number 00036
Number of page(s) 9
DOI https://doi.org/10.1051/e3sconf/20186000036
Published online 16 October 2018
  1. Khomenko, O., & Maltsev, D. (2013). Laboratory research of influence of face area dimensions on the state of uranium ore layers being broken. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, 31–37. [Google Scholar]
  2. Shirin, A., Rastsvetaev V., & Morozova, T. (2012). Estimation of reliability and capacity of auxiliary vehicles while preparing coal reserves for stoping. Geomechanical Processes during Underground Mining: School of Underground Mining 2012, 105–108. https://doi.org/10.1201/b13157-18 [Google Scholar]
  3. Shyrin, A., Rastsvetaiev, V., & Inyutkin, I. (2017). Operativno-proizvodstvennoe upravlenie tekhnicheskim sostoyaniem transportno-tekhnologicheskikh skhem gornorudnykh predpriyatiy. Visnyk Kryvorizkoho Natsionalnoho Universytetu, 38–43. [Google Scholar]
  4. Kovalevska, I., Symanovych, G., & Fomychov, V. (2013). Research of stress-strain state of cracked coal-containing massif near-the-working area using finite elements technique. Annual Scientific-Technical Collection – Mining of Mineral Deposits, 159–163. https://doi.org/10.1201/b16354-28 [Google Scholar]
  5. Shirin, L., Korovyaka, Y., & Tokar, L. (2011). Justification of design parameters of compact load-haul dumper to mine narrow vein heavy pitching deposits. Technical and Geoinformational Systems in Mining, 85–92. https://doi.org/10.1201/b11586-15 [CrossRef] [Google Scholar]
  6. Bartashevski, S.E., Strashko, V.A., Shirin, L.N., & Shumrikov, V.V. (2001). Mathematical Models of Work-cycle Time of Ladleman Loading Machine. Vibration in Methods and Technology, 3(19), 46–49. [Google Scholar]
  7. Shirin, L., & Iniutkin, I. (2009). Osobennosti formirovaniya transportno-tekhnologicheskikh sistem podzemnyh rudnikov s uchetom adaptatsionnykh vozmozhnostey samokhodnogo oborudovaniya. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, 66–68. [Google Scholar]
  8. Shirin, L.N., Korovyaka, Е.А., & Shirin, A.L. (1998). Model Analysis of Adaptive Capacity of Load-haul Dumpers to Mine Narrow Vein Deposits. Inter-agency Collection of Scientific Papers of IGTM of the NAS of Ukraine, (6), 67–73. [Google Scholar]
  9. Kalnitskiy, Ya. & Filimonov, A. (1974). Samokhodnoe pogruzochnoe i dostavochnoe oborudovanie na podzemnykh rudnikakh. Мoskva: Nedra. [Google Scholar]
  10. Malinovskiy, E. & Gaytsgori, M. (1974). Dinamika samokhodnykh mashin s sharnirnoy ramoy. Moskva: Mashinostroenie. [Google Scholar]
  11. Beihul, O., & Kolesnyk, I. (2011). Dynamika ta mitsnist metalurhiinykh mashyn. Dniprodzerzhynsk: Dniprodzerzhynskyi derzhavnyi tekhnichnyi universytet. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.