Open Access
Issue
E3S Web Conf.
Volume 65, 2018
International Conference on Civil and Environmental Engineering (ICCEE 2018)
Article Number 03001
Number of page(s) 16
Section Construction Management
DOI https://doi.org/10.1051/e3sconf/20186503001
Published online 26 November 2018
  1. Pettigrew, R., Payment under construction contracts legislation (Thomas Telford, London, 2005). [Google Scholar]
  2. Wu, J., M. Kumaraswamy, and G. Soo, J Prof Iss Eng Ed Pr 134, 4 (2008). [Google Scholar]
  3. Sambasivan, M. and Y.W. Soon, Int J Proj Manag, 25, 5(2007). [Google Scholar]
  4. Hamimah, A., et al., Procedia Soc Behav Sci 35, (2012). [Google Scholar]
  5. Che Munaaim, M.E., M.S. Mohd Danuri, and H. Abdul-Rahman, J.D.B.E 3, 1 (2007). [Google Scholar]
  6. Lim, C.F., Master Builders 4th Quarter, (2005). [Google Scholar]
  7. Harbans Singh, K.S., Engineering and Construction Contracts Management Post Commencement Practice (Malaysia, Malayan Law Journal Sdn Bhd, 2003). [Google Scholar]
  8. Rogers, E.M., Diffusion of Innovations (New York, Free Press, 2003). [Google Scholar]
  9. Zainul Abidin, N., Habitat Int 34 (2010). [Google Scholar]
  10. Tran, K.C., Ocean Coast Manag 49 (2006). [Google Scholar]
  11. Judi, S.S. and R. Abdul Rashid, JSCP 1 (2010). [CrossRef] [Google Scholar]
  12. Chow, K.F., Construction Contracts Dictionary (Sweet and Maxwell Asia, Singapore, 2006). [Google Scholar]
  13. Sheridan, P. Suspension of work (Available from: http://www.sheridangold.co.uk/articles/suspension_of_work.pdf, 2012). [Google Scholar]
  14. Chappel, D., Construction Contracts& Answer (USA, Taylor and Francis, 2006). [CrossRef] [Google Scholar]
  15. Kho, M. and H. Abdul Rahman, Risk of Late Payment in the Malaysian Construction Industry (WASET 41, 2010). [Google Scholar]
  16. Liu, Z., IJBM 5, 2 (2010). [Google Scholar]
  17. Coulter, C. and C.A. Kelley, Contractor Financial Management and Construction Productivity Improvement: Phase 1 (University of Florida, School of Building Construction, 1992). [Google Scholar]
  18. Fikri Hasmori, M. I. Ismail, and I. Said. Issues of Late and Non-Payment among Contractors in Malaysia. in 3rd International Conference on Business and Economic Research (3rd ICBER 2012) Proceeding (Golden Flower Hotel, Bandung, Indonesia, 2012). [Google Scholar]
  19. Tan, E., The Common Law Right of Set-off in Construction Contracts (Lexis Nexis The Malayan Law Journal Article, 1995). [Google Scholar]
  20. Ajzen, I., Constructing a TPB Questionnaire. Conceptual and Methodological Considerations (2006). [Google Scholar]
  21. Taylor, S. and P.A., Inf. Syst. Res 6, 2 (1995). [Google Scholar]
  22. Ajzen, I., Organ. Behav. Hum. Decis. Process 50, 2(1991). [Google Scholar]
  23. Sheeran, P., et al., Implementation Intentions and Health Behaviour (Bibliothek der Universität Konstanz, 2005). [Google Scholar]
  24. Ajzen, I., Pers. Soc. Psychol. Rev 6, 2 (2002). [CrossRef] [Google Scholar]
  25. Ajzen, I., Psychol Health Med 26, 9 (2011). [Google Scholar]
  26. CIDB, Registration Requirement and Procedure (CIDB Malaysia, 2016) [Google Scholar]
  27. Ajzen, I. and B.L. Driver, Leis Sci, 1991 13, 3 (1991). [CrossRef] [Google Scholar]
  28. DiMaggio, P.J. and W.W. Powell, Am. Sociol. Rev 48, 2 (1983). [CrossRef] [Google Scholar]
  29. Cao, D., H. Li, and W. Guangbin, J Constr Eng Manag 140, 40 (2014). [CrossRef] [Google Scholar]
  30. Teo, H.H., K.K. Wei, and I. Benbasat, Manag. Inf. Syst. Q 27, 1 (2003). [CrossRef] [Google Scholar]
  31. Lee, C.K., T.W. Yiu, and S.O. Cheung, Int J Proj Manag 34, 3 (2016). [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.