E3S Web Conf.
Volume 65, 2018
International Conference on Civil and Environmental Engineering (ICCEE 2018)
Article Number 03004
Number of page(s) 10
Section Construction Management
DOI https://doi.org/10.1051/e3sconf/20186503004
Published online 26 November 2018
  1. S. D. Berlinda Lessing, Derek Thurnell, “Main Factors Causing Delays in Large Construction Projects : Evidence from New Zealand,” J. Manag. Econ. Ind. Organ., vol. Vol.1 No.2, no. August, p. pp.63-82, 2017. [Google Scholar]
  2. M. M. Marzouk and T. I. El-Rasas, “Analyzing delay causes in egyptian construction projects,” J. Adv. Res., vol. 5, no. 1, pp. 49-55, 2014. [Google Scholar]
  3. S. Durdyev, M. Omarov, and S. Ismail, “Causes of delay in residential construction projects in Cambodia,” Cogent Eng., vol. 4, no. 1, pp. 1-12, 2017. [Google Scholar]
  4. F. Elharare, A. Elhaniash, and S. Stevovic, “Towards factors affecting delays in construction projects : A case of Libya,” vol. 2, no. 1, pp. 2013-2016, 2016. [Google Scholar]
  5. A. S. Faridi and S. M. El-Sayegh, “Significant factors causing delay in the UAE construction industry,” Constr. Manag. Econ., vol. 24, no. 11, pp. 1167-1176, 2006. [CrossRef] [Google Scholar]
  6. “Statistik Projek-Projek Perumahan Swasta Mengikut Kategori Sehingga 30 April 2018,” no. April, p. 2018, 2018. [Google Scholar]
  7. M. F. N. and B. J. F. Trauner, T. J., W. A. Manginelli, J. S. Lowe, Construction Delays: Understanding Them Clearly, Analyzing Them Correctly. 2009. [Google Scholar]
  8. A. Walker, Project Management In Construction, 2015. [Google Scholar]
  9. W. Koshe and K. N. Jha, “Investigating Causes of Construction Delay in Ethiopian Construction Industries,” J. Civil, Constr. Environ. Eng., vol. 1, no. 1, pp. 18-29, 2016. [Google Scholar]
  10. G. X. Chen, M. Shan, A. P. C. Chan, X. Liu, and Y. Q. Zhao, “Investigating the causes of delay in grain bin construction projects: the case of China,” Int. J. Constr. Manag., vol. 3599, no. August, pp. 1-14, 2017. [Google Scholar]
  11. M. K. Sha, P. B. Shahi, R. Pandit, and A. Pandey, “Causes and Effects of Delays in Constrution Projets,” IOSR J. Mech. Civ. Eng., vol. 14, no. 2, pp. 52-58, 2017. [CrossRef] [Google Scholar]
  12. A. A. Salunkhe, “Identification of critical construction delay factors Identification of Critical Construction Delay Factors,” no. April 2014, 2018. [Google Scholar]
  13. M. M. Atout, “Delays Caused by Project Consultants and Designers in Construction Projects,” Int. J. Struct. Civ. Eng. Res., vol. 5, no. 2, 2016. [Google Scholar]
  14. R. A. Khan and W. Gul, “Emperical study of critical risk factors causing delays in construction projects,” Proc. 2017 IEEE 9th Int. Conf. Intell. Data Acquis. Adv. Comput. Syst. Technol. Appl. IDAACS 2017, vol. 2, pp. 900-906, 2017. [Google Scholar]
  15. R. K. Shah, “An Exploration of Causes for Delay and Cost Overruns In Construction Projects: Case Study of Australia, Malaysia & Ghana,” J. Adv. Coll. Eng. Manag., vol. 2, no. July, p. 41, 2016. [CrossRef] [Google Scholar]
  16. S. P. Wanjari and G. Dobariya, “Identifying factors causing cost overrun of the construction projects in India,” Sadhana - Acad. Proc. Eng. Sci., vol. 41, no. 6, pp. 679-693, 2016. [Google Scholar]
  17. M. Kesavan, N. N. Gobidan, and P. B. G. Dissanayake, “Planning & mitigation methods to reduce the project delays in Sri Lankan civil engineering construction industries,” no. 12, pp. 102-107, 2015. [Google Scholar]
  18. O. J. Emeka, “Causes of delay in large construction project in Nigeria construction industry,” Uclan Univercity of Central Lancashire, 2016. [Google Scholar]
  19. Kang Sik Wei, “Causes, effects and methods of minimizing delays in construction projects,” Univ. Teknol. Malaysia, 2010. [Google Scholar]
  20. C. Kaliba, M. Muya, and K. Mumba, “Cost escalation and schedule delays in road construction projects in Zambia,” Int. J. Proj. Manag., vol. 27, no. 5, pp. 522-531, 2009. [CrossRef] [Google Scholar]
  21. P. A. Koushki, K. Al-Rashid, and N. Kartam, “Delays and cost increases in the construction of private residential projects in Kuwait,” Constr. Manag. Econ., vol. 23, no. 3, pp. 285-294, 2005. [CrossRef] [Google Scholar]
  22. R. F. Aziz, “Ranking of Delay Factor in Construction Projects After Egyption Revolution,” Alexandria Eng. J., vol. 52, no. 3, pp. 387-406, 2013. [CrossRef] [Google Scholar]
  23. S. Hussain, F. Zhu, Z. Ali, H. Aslam, and A. Hussain, “Critical Delaying Factors: Public Sector Building Projects in Gilgit-Baltistan, Pakistan,” Buildings, vol. 8, no. 1, p. 6, 2018. [CrossRef] [Google Scholar]
  24. R. Divya and S. Ramya, “Causes, Effects And Method Of Minimizing Delays In Construction Projects,” Natl. Conf. Res. Adv. Commun. Comput. Electr. Sci. Struct., pp. 47-53, 2015. [Google Scholar]
  25. M. A. Othuman Mydin, N. M. Sani, M. Taib, and N. Mohd Alias, “Imperative Causes of Delays in Construction Projects from Developers’ Outlook,” MATEC Web Conf., vol. 10, p. 6005, 2014. [Google Scholar]
  26. M. Gündüz, Y. Nielsen, and M. Özdemir, “Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey,” J. Manag. Eng., vol. 29, no. 2, pp. 133-139, 2012. [Google Scholar]
  27. R. A. Khan, U. Gazder, and A. Qayoom, “International Journal of Advanced and Applied Sciences Comparison of delay factors and remedies’ rankings for building construction projects in developing countries,” vol. 4, no. 4, pp. 33-42, 2017. [Google Scholar]
  28. A. Boru, “Determinants of Delay and Cost Overruns in Kenya’ S Public Sector Construction Projects: A Case of Meru County, Kenya. Adano Boru a Research Project Submitted In Partial Fulfillment of the Requirements for the Award of the Degree of Master of Arts In,” 2016. [Google Scholar]
  29. B. JR, M. JM, H. ROTHBART, and H. RB, “Causes of delay in the construction industry,” ASCE J Constr Div, vol. 97, no. CO2, pp. 177-187, 2016. [Google Scholar]
  30. N. Al-Emad, I. Abdul Rahman, S. Nagapan, and Y. Gamil, “Ranking of Delay Factors for Makkah’s Construction Industry,” MATEC Web Conf., vol. 103, p. 3001, 2017. [CrossRef] [EDP Sciences] [Google Scholar]
  31. R. Apolot, H. Alinaitwe, and D. Tindiwensi, “An Investigation into the Causes of Delay and Cost Overrun in Uganda’s Public Sector Construction Projects,” Second Int. Conf., pp. 305-312, 2011. [Google Scholar]
  32. K. Khair, Z. Mohamed, R. Mohammad, H. Farouk, and M. E. Ahmed, “A Management Framework to Reduce Delays in Road Construction Projects in Sudan,” Arab. J. Sci. Eng., vol. 43, no. 4, pp. 1925-1940, 2018. [CrossRef] [Google Scholar]
  33. R. Assefa, “School of Graduate Studies Schedule Delay Identification and Assessment on Addis Ababa’S Light Rail Transit Construction,” 2015. [Google Scholar]
  34. S. A. Assaf and S. Al-Hejji, “Causes of delay in large construction projects,” Int. J. Proj. Manag., vol. 24, no. 4, pp. 349-357, 2006. [CrossRef] [Google Scholar]
  35. R. F. Aziz and A. A. Abdel-Hakam, “Exploring delay causes of road construction projects in Egypt,” Alexandria Eng. J., vol. 55, no. 2, pp. 1515-1539, 2016. [CrossRef] [Google Scholar]
  36. M. Rafieizonooz, M. R. Salim, E. Khankhaje, M. Warid Hussin, A. Zarebidaki, and Salmiati, “Determining the Causes of Delay by Using Factor Analysis in Tehran’s Construction Projects,” Appl. Mech. Mater., vol. 735, no. October, pp. 109-116, 2015. [CrossRef] [Google Scholar]
  37. E. Science, “Mitigating delay and non-payment in the Malaysian construction industry Mitigating delay and non-payment in the Malaysian construction industry,” pp. 0-6, 2018. [Google Scholar]
  38. A. A. Salunkhe and R. S. Patil, “Effect of Construction Delays on Project Time Overrun: Indian Scenario,” Int. J. Res. Eng. Technol., vol.3, no.1, pp. 543-547, 2014. [Google Scholar]
  39. M. M. Amandin and J. W. Kule, “Project Delays on Cost Overrun Risks: A Study of Gasabo District Construction Projects Kigali, Rwanda,” J. Adv. Res., vol. 5, no. 1, pp. 21-34, 2016. [Google Scholar]
  40. D. M. Matin, “Identifying The Effective Factors for Cost Overrun and Time Delay inWater Construction Projects,” Eng. Technol. Appl. Sci. Res., vol. 6, no. 4, pp. 1062-1066, 2016. [Google Scholar]
  41. S. Y. Kim, K. N. Tuan, and V. T. Luu, “Delay factor analysis for hospital projects in Vietnam,” KSCE J. Civ. Eng., vol. 20, no. 2, pp. 519-529, 2016. [Google Scholar]
  42. M. Mishmish and S. M. El-Sayegh, “Causes of claims in road construction projects in the UAE,” Int. J. Constr. Manag., vol. 18, no. 1, pp. 26-33, 2018. [Google Scholar]
  43. Y. C. Kog and D. Ph, “Project Management and Delay Factors of Public Housing Construction,” vol. 23, no. 1, 2018. [Google Scholar]
  44. D. M. Matin, “Identifying The Effective Factors for Cost Overrun and Time Delay in\nWater Construction Projects,” Eng. Technol. Appl. Sci. Res., vol. 6, no. 4, pp. 1062-1066, 2016. [Google Scholar]
  45. M. B. I. Mohamed, “a Study of Project Delay in Sudan,” 2015. [Google Scholar]
  46. R. F. Aziz, Ranking of delay factors in construction projects after Egyptian revolution, vol. 52, no. 3. Faculty of Engineering, Alexandria University, 2013. [Google Scholar]
  47. D. Gabbay, P. Thagard, and J. Woods, Philosophy of Technology and Engineering Sciences. 2009. [Google Scholar]
  48. M. M. Tahir, N. A. Haron, A. H. Alias, A. N. Harun, I. B. Muhammad, and D. L. Baba, “Improving cost and time control in construction using building information model (Bim): A review,” Pertanika J. Sci. Technol., vol. 26, no. 1, pp. 21-36, 2018. [Google Scholar]
  49. S. Shujaa, S. Gardezi, U. Teknologi, N. Shafiq, and U. Teknologi, “Prospects of Building Information Modeling (BIM) in Malaysian Construction Industry as Conflict Resolution Tool Prospects of Building Information Modeling (BIM) in Malaysian Construction Industry as Conflict Resolution Tool,” 2013. [Google Scholar]
  50. Z. A. Essa Alenazi, “Building Information Modelling for Construction Delay Management,” world Acad. Sci. Eng. Technol. Int. J. Ciil Environ. Eng., vol. 11, no. 6, pp. 823-834, 2017. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.