Open Access
Issue
E3S Web Conf.
Volume 65, 2018
International Conference on Civil and Environmental Engineering (ICCEE 2018)
Article Number 03005
Number of page(s) 14
Section Construction Management
DOI https://doi.org/10.1051/e3sconf/20186503005
Published online 26 November 2018
  1. A. Almohsen and J. Ruwanpura, “Logistics Management in the Construction Industry,” Cib W78-W102 10, (2011) [Google Scholar]
  2. N. Kasim, A. Shamsuddin, R. Zainal, and N. C. Kamarudin, “Implementation of RFID technology for real-time materials tracking process in construction projects,” CHUSER 2012 - 2012 IEEE Colloq. Humanit. Sci. Eng. Res., no. Chuser 699-703 (2012) [CrossRef] [Google Scholar]
  3. D. Gedam, “Automation in Material Management System- Critical Review,” Int. J. Res. Eng. Sci. Technol. 1, 354-358 (2001) [Google Scholar]
  4. A. A. S. S. Pande, “Study of Material Management Techniques on Construction Project,” Int. J. Inf. Futur. Res. 2, 3479-3486 (2015) [Google Scholar]
  5. C. Duiyong, J. Shidong, and S. Mingshan, “Engineering Construction Project Site Logistics Management,” J. Chem. Pharm. Res. 6, 353-360 (2014) [Google Scholar]
  6. S. H. Mastor, “Pemahaman serta Kesediaan dalam Mengaplikasikan Sistem Just In Time (JIT) dalam Pengurusan Bahan Binaan di Kalangan Pembekal Bahan-Bahan di Johor Bahru, Johor,” Tesis Ijazah Sarjana(Sains) Pengur. Proj. (2003) [Google Scholar]
  7. J. Spillane, L. Oyedele, J. Meding, A. Konanahalli, B. Jaiyeoba, and I. Tijani, “Challenges of UK/Irish Contractors Regarding Material Management and Logistics in Confined Site Construction,” Int. J. Constr. Supply Chain Manag. 1, 25-42 (2011) [CrossRef] [Google Scholar]
  8. J. Spillane and L. O. Oyedele, “Strategies for Effective Management of Health and Safety in Confined Site Construction,” Constr. Econ. Build. 13, 50-64 (2013) [CrossRef] [Google Scholar]
  9. M. M. Mortaheb, J. Y. Ruwanpura, R. Dehghan, and F. Khoramshahi, “Major Factors Influencing Construction Productivity in Industrial Congested Sites,” CSCE 2007 Annu. Gen. Meet. Conf. 1111-1120 (2007) [Google Scholar]
  10. S. R. Liwan, “The Framework of Improving on-Site Materials Tracking for Inventory Management Process in Construction Projects,” A Thesis degree Master Technol. Manag. 180 (2015) [Google Scholar]
  11. I. Brutus and O. Chiyem, “Assessment of Material Management and Profitability of an Organization,” J. Policy Dev. Stud. 9, 153-165 (2015) [CrossRef] [Google Scholar]
  12. B. T. Arijeloye and F. O. Akinradewo, “Assessment of Materials Management on Building Projects in Ondo State, Nigeria,” WSN World Sci. News 55, 168-185 (2016) [Google Scholar]
  13. E. E. Ogbadu, “Profitability Through Effective Management of Materials,” J. Econ. Int. Financ. 1, 99-105 (2009) [Google Scholar]
  14. P. Alanjari, S. Razavialavi, and S. Abourizk, “A Simulation-based Approach for Material Yard Laydown Planning,” Autom. Constr. 40, 1-8 (2014) [CrossRef] [Google Scholar]
  15. X. Song, J. Xu, C. Shen, and F. Peña-Mora, “Conflict Resolution-Motivated Strategy Towards Integrated Construction Site Layout and Material Logistics Planning: A bi-Stakeholder Perspective,” Autom. Constr. 87, 138-157 (2018) [CrossRef] [Google Scholar]
  16. K. A. Okorocha, “Factors Affecting Effective Materials Management in bUILDING Construction Projects- A Case Study of Selected Building Sites, in IMO State, Nigeria,” Int. J. Manag. Sci. Bus. Res. 2, 50-59 (2004) [Google Scholar]
  17. S. Donyavi and R. Flanagan, “the Impact of Effective Material Management on Construction Site Performance for Small and Medium Sized Construction Enterprises,” Dainty, A.R.J. Procs 25th Annu. ARCOM Conf. 11-20 (2009) [Google Scholar]
  18. U.S Department of Labor, “Material Handling and Storage,” OSHA 2236 1-35 (2002) [Google Scholar]
  19. N. Ahzahar, N. A. Karim, S. H. Hassan, and J. Eman, “A study of Contribution Factors to Building Failures and Defects in Construction Industry,” Procedia Eng. 20, 249-255 (2011) [Google Scholar]
  20. Z. Ahmed, “The Impact of Material Management On Construction Project Delivery in Maldives,” A Thesis Mster Proj. Manag. 104 (2017) [Google Scholar]
  21. K. V. Patel and C. M. Vyas, “Construction Material Management,” Natl. Conf. Recent Trends Eng. Technol. (2011) [Google Scholar]
  22. H. Said and K. El-Rayes, “Optimal Material Logistics Planning in Congested Construction Sites,” Constr. Res. Congr. 1580-1589 (2012) [Google Scholar]
  23. N. Kasim, S. R. Liwan, A. Shamsuddin, R. Zainal, and N. C. Kamaruddin, “Improving on-Site Materials Tracking for Inventory Management in Construction Projects,” Proc. Int. Conf. Technol. Manag., Bus. Entrep. (2012) [Google Scholar]
  24. N. N. Dawood, “Materials Management Systems for the Construction Industry,” CIß TG 16, Sustain. Conslruclion 735-743 (1994) [Google Scholar]
  25. A. M. Shaari and N. S. M. Nor, “Position and Orientation Detection of Stored Object Using RFID Tags,” Procedia Eng. 184, 708-715 (2017) [CrossRef] [Google Scholar]
  26. M. Skibniewski, “Research Trends in Information Technology Applications in Construction Safety Engineering and Management,” Front. Eng. Manag. 1, 246-259 (2014) [CrossRef] [Google Scholar]
  27. W. Lu, G. Q. Huang, and H. Li, “Scenarios for Applying RFID Technology in Construction Project Management,” Autom. Constr. 20, 101-106 (2011) [CrossRef] [Google Scholar]
  28. H. Li, Z. Chen, L. Yong, and S. C. W. Kong, “Application of Integrated GPS and GIS Technology for Reducing Construction Waste and Improving Construction Efficiency,” Autom. Constr. 14, 323-331 (2005) [CrossRef] [Google Scholar]
  29. J. Neese, P. Assistant, K. Snodgrass, and P. Leader, “Bar-Code Tracking Systems Overview,” Technol. Dev. Progr. 1-8 (2002) [Google Scholar]
  30. T. Horenburg, J. Wimmer, S. Kessler, and W. A. Günthner, “3D-Planning of Construction Site Equipment based on Process Simulation,” Proc. 13th Int. Conf. Comput. Civ. Build. Eng. (2010) [Google Scholar]
  31. S. Gore, L. Song, and N. Eldin, “Photo-Modeling for Construction Site Space Planning,” (2017) [Google Scholar]
  32. J. Teizer, “3D Range Imaging Camera Sensing for Active Safety in Construction,” J. Inf. Technol. Constr. 13, 103-117 (2008) [Google Scholar]
  33. K. W. Chau, A. M., and J. P. Zhang, “Four-Dimensional Visualization of Construction Scheduling and Site Utilization,” J. Constr. Eng. Manag. 130, 598-606 (2004) [CrossRef] [Google Scholar]
  34. G. H. Watson, R. L. Tucker, J. K. Walters, K. Varghesea, and J. T. O’connor, “Automated Access Planning On Construction Sites: An Expert GIS Approach,” Autom. Robot. Constr. 325-332 (1993) [Google Scholar]
  35. M. H. S. et al., “Potential Application of GIS to Layout of Construction Temporary Facilities,” Int. J. Civ. Eng. 6, 235-245 (2008) [Google Scholar]
  36. V. Kumar, “JIT Based Quality Management: Concepts and Implications in Indian Context,” Int. J. Eng. Sci. Technol. 2, 40-50 (2010) [Google Scholar]
  37. I. A. Ocheoha and O. Moselhi, “Impact of Building Information Modeling on Just-In-Time Material Delivery,” ISARC 2013 - 30th Int. Symp. Autom. Robot. Constr. Mining, Held Conjunction with 23rd World Min. Congr. 793-801 (2013) [Google Scholar]
  38. Y. Tedla and D. Patel, “Improving Effective Material Management by Identifying common Factors in Building Construction Project,” Int. Res. J. Eng. Technol. 5, 146-150 (2018) [Google Scholar]
  39. J. Bong Chunn Tat, “Factors affecting in the preparation of construction work schedule,” Thesis degree Master Sci. (2009) [Google Scholar]
  40. Z. M. Jusoh and N. Kasim, “Influential Factors Affecting Materials Management in Construction Projects,” Manag. Prod. Eng. Rev. 8, 82-90 (2017) [Google Scholar]
  41. S. Razavialavi and S. AbouRizk, “Simulation Applications in Construction Site Layout Planning,” Proc. 30th Int. Symp. Autom. Robot. Constr. Min. 3, 275-284 (2013) [Google Scholar]
  42. M. Park, Y. Yang, H.-S. Lee, S. Han, and S. Ji, “Floor-Level Construction Material Layout Planning Model Considering Actual Travel Path,” J. Constr. Eng. Manag. 138, 905-915 (2012) [CrossRef] [Google Scholar]
  43. S. Bauer and R. Lackner, “Gradient-Based Adaptive Discontinuity Layout Optimization for The Prediction of Strength Properties in Matrix-Inclusion Materials,” Int. J. Solids Struct. 63, 82-98 (2015) [CrossRef] [Google Scholar]
  44. Z. Liu, S. Cho, A. Takezawa, X. Zhang, and M. Kitamura, “Two-stage Layout-Size Optimization Method for Prow Stiffeners,” Int. J. Nav. Archit. Ocean Eng. 1-8 (2018) [Google Scholar]
  45. P. Alanjari, S. RazaviAlavi, and S. AbouRizk, “Materials and Facility Layout Planning in Construction Projects Using Simulation,” Proc. 2014 Winter Simul. Conf. 1469-1480 (2014) [Google Scholar]
  46. D. Suhardini, W. Septiani, and S. Fauziah, “Design and Simulation Plant Layout Using Systematic Layout Planning,” IOP Conf. Ser. Mater. Sci. Eng. 277, 1-8 (2017) [CrossRef] [Google Scholar]
  47. D. Bäck and P. Johansson, “A Model for Effective Development of Plant Layouts and Material Handling Systems,” 67 (2006) [Google Scholar]
  48. I. Tommelein, “Materials Handling and Site Layout Control,” Autom. Robot. Constr. 297-304 (1994) [Google Scholar]
  49. D. A. Hailemariam, “Redesign of the Layout and the Materials Flow of a Production Plant,” A Master Thesis Conduct. Prod. Plant Moxba-Metrex (2010) [Google Scholar]
  50. M. Hansson and N. Hedberg, “Construction Logistics from A Subcontractor Perspective A case Study of A Congested Construction Site,” Master Sci. Thesis Des. Constr. Proj. Manag. Program. (2015) [Google Scholar]
  51. A. R. Patil and S. V Pataskar, “Analyzing Material Management Techniques on Construction Project,” Int. J. Eng. Innov. Technol. 3, 96-100 (2013) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.