Open Access
Issue
E3S Web Conf.
Volume 97, 2019
XXII International Scientific Conference “Construction the Formation of Living Environment” (FORM-2019)
Article Number 06020
Number of page(s) 8
Section New Construction Technologies
DOI https://doi.org/10.1051/e3sconf/20199706020
Published online 29 May 2019
  1. A. Simms, T. Nichols Social Loafing: A Review of the Literature. Journal of Management Policy and Practice, Vol. 15, issue 1, pp. 58-67 (2014) [Google Scholar]
  2. P. Vermeulen, J. Benders A reverse side of the team medal. Team Performance Management: An International Journal, Vol. 9, issue: 5/6, pp. 107-114 (2003) [CrossRef] [Google Scholar]
  3. M. S. Viteles Motivation and Moral in Industry. W. W. Norton & Co. New York, p. 134 (1953) [Google Scholar]
  4. D. Hewitt, J. Parfit On Working Morale and Size of Group. Occupational Psychology (1953) [Google Scholar]
  5. B. V. Lukanin Determination of the optimal number of workers in construction and installation work // Tekhnicheskaya informaciya. Gosstroj Kazahskoj SSR, respublikanskij centr nauchno-tekhnicheskoj informacii po stroitel’stvu, stroitel’nomu proektirovaniyu i inzhenernym izyskaniyam. [Technical information. Gosstroy of the Kazakh SSR, the republican center of scientific and technical information on construction, construction design and engineering surveys], no 10 (1970) (in Russian). [Google Scholar]
  6. I. V. Kim Investigation of the influence of the duration of construction on the economics of construction organizations. PhD Thesis. Мoscow (1974) (in Russian) [Google Scholar]
  7. G. L. Isaeva Investigation of methods of rational saturation of the front with labor resources and mechanization means. PhD Thesis. Volgograd (1975). (in Russian). [Google Scholar]
  8. F. F. Dzhalilov Development of methods for the formation of organizational and technological solutions for the reconstruction of existing enterprises. PhD Thesis. Мoscow (1996) (in Russian) [Google Scholar]
  9. T. L. Simankina Improving the scheduling of resource-saving flows, taking into account the additivity of the intensity of labor of performers. PhD Thesis. SPb (2007) (in Russian) [Google Scholar]
  10. I. L. Abramov Modeling of technological processes in low-rise housing construction. PhD Thesis. Мoscow (2007) (in Russian) [Google Scholar]
  11. M. Kaya, A. E. Keles, E. L. Oral Construction Crew Productivity Prediction by Using Data Mining Methods. Procedia Social and Behavioral Sciences, Vol. 141, pp. 1249–1253 (2014) [CrossRef] [Google Scholar]
  12. J. Lee, Y.-J. Park, Ch.-H. Choi, Ch.-H. Han BIM-assisted labor productivity measurement method for structural formwork. Automation in Construction, Vol. 84, pp. 121–132 (2017) [Google Scholar]
  13. A. A. Lapidus, K. S. Tolstova Kriterij ocenki dopustimosti sovmeshcheniya stroitel’nyh processov pri proizvodstve otdelochnyh rabot v zhilyh zdaniyah [The criterion for assessing the admissibility of combining construction processes in the production of finishing works in residential buildings] // Promyshlennoe i grazhdanskoe stroitel’stvo, no. 5, pp. 68-71 (2016) (in Russian) [Google Scholar]
  14. B. K. Pergamenshchik, V. A. Undozjorov Proizvoditel’nost’ truda v stroitel’stve v funkcii nasyshchennosti fronta rabot trudovymi resursami [Labor productivity in the construction industry in the function of the saturation of the work front by the labor resource] // Ehkonomika stroitel’stva, no. 5, pp. 25-34 (2018) (in Russian). [Google Scholar]
  15. A. V. Markov, A. V. Korotaev A Hyperbolic growth in wildlife and society. Мoscow, 200 p. (2009) (in Russian) [Google Scholar]
  16. S. P. Kapitsa Paradoxes of growth. The laws of human development. Мoscow, 204 p. (2012) (in Russian) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.