Open Access
Issue
E3S Web Conf.
Volume 131, 2019
2nd International Conference on Biofilms (ChinaBiofilms 2019)
Article Number 01027
Number of page(s) 4
DOI https://doi.org/10.1051/e3sconf/201913101027
Published online 19 November 2019
  1. Cundall, P. A., Strack, O. D. L. (1979): “A discrete numerical model for granular assemblies,” Geotechnique, Vol.29, No.1, pp.47-47. [Google Scholar]
  2. Swoboda, G., Moussa, A. (1994): “Numerical modeling of shotcrete and concrete tunnel linings,” Tunnelling and Ground Conditions, pp.427-436. [Google Scholar]
  3. Jiang, S. P., Hu, X. B. (2004): “The numerical analysis of constructional mechanical responses of Yangzong tunnel,” Chinese Journal of Geotechnical Engineering, Vol.26, No.2, pp.178-181. [Google Scholar]
  4. Zhao, W., Wu, S. C., Gao, Y. T., Zhou, Y., Xiao, S. (2015): “Numerical modeling and mechanical parameters determination of jointed rock mass,” Journal of University of Science and Technology, Vol.37, No.12, pp.1542-1549. [Google Scholar]
  5. Wilkins, M. L. (1964): “Fundamental Methods in Hydrodynamics. Methods in Computational Physics,” New York:Academic Press, pp.211-263. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.