Open Access
Issue |
E3S Web Conf.
Volume 136, 2019
2019 International Conference on Building Energy Conservation, Thermal Safety and Environmental Pollution Control (ICBTE 2019)
|
|
---|---|---|
Article Number | 01014 | |
Number of page(s) | 5 | |
Section | Ultra-Low Energy Consumption Building Technology | |
DOI | https://doi.org/10.1051/e3sconf/201913601014 | |
Published online | 10 December 2019 |
- Kim S. Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation[J]. Statyba. [Google Scholar]
- Wang FP. Subdividing Method and Applied Research of Power Transmission and Transformation Project Cost Control [D].Chongqing: Chongqing University, 2015. [Google Scholar]
- Zhang GL, Wen WN, Li PD, et al. Reasonable Interval Calculation Method for Power Transmission Project Cost Based on Chebyshev‘s Inequality [J]. Electric Power Construction, 2014, 35(9):118-122. [Google Scholar]
- Ling YP, Yan PF, Han CZ, et al. BP Neural Network Based Cost Prediction Model for Transmission Projects [J]. Electric Power, 2012, 45(10):95-99. [Google Scholar]
- Wang X, Geng P, Yuan J. Study on the Prediction Model of Overhead Line Cost of Power Grid [J]. China Electric Power Enterprise Management, 2018 (24): 76-77. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.