Open Access
Issue |
E3S Web Conf.
Volume 136, 2019
2019 International Conference on Building Energy Conservation, Thermal Safety and Environmental Pollution Control (ICBTE 2019)
|
|
---|---|---|
Article Number | 04038 | |
Number of page(s) | 5 | |
Section | Urban Public Safety | |
DOI | https://doi.org/10.1051/e3sconf/201913604038 | |
Published online | 10 December 2019 |
- Zhou, S. (2001) Road and bridge construction calculation manual. China Communications Press, Beijing. [Google Scholar]
- Xu, W. (2018) Application of Smooth Blasting Construction Technology in Expressway Tunnel. Building Materials and Decoration, 16: 240-241. [Google Scholar]
- Luo, M. (2018) Key Technology Analysis of Smooth Blasting Construction in Mountain Tunnel. Anhui Architecture, 47: 783-786. [Google Scholar]
- Zhang, J.B. (2012) Research on Construction Technology of Deep Hole Groove Smooth Blasting in Large Section Hard Rock Tunnel. In: The 17th Annual Meeting of the 15th Annual Meeting of the China Civil Engineering Society and the Tunnel and Underground Engineering Branch. Kunming. pp. 430-433. [Google Scholar]
- Yin, B. (2019) Application Analysis of Smooth Blasting Construction Technology for Expressway Tunnel. Value Engineering, 12: 99-101. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.